May 20, 2026

Gold X2 Mining Inc.
Gold X2 Intersects 27.0m of 3.87 g/t Au from 555.0m at Base of the Eastern QES Pit Including 11.0m of 8.84 g/t Au

Gold X2 Intersects 60.7m of 1.51 g/t Au from 47.0m at QES as Part of the Moss Gold Project Infill Drilling Program

Gold X2 Expands 2026 Drilling Campaign to 160,000 Meters; Eight Drill Rigs Operating by the End of June

Gold X2 Intersects Several Shallow, High-Grade Intercepts in the Superion Zone Including 6.10m of 10.4 g/t Au

Gold X2 QES Drilling Intercepts 100.75m of 1.50 g/t Au from 495m Including 14m of 3.94 g/t Au from 542m at the Base of the Resource Pit

Gold X2 Discovers Two Mineralized Shears on the Deaty Trend Including 17.0m @ 1.23 g/t Au

Gold X2 Announces Positive Reconciliation in Main Zone Grade Control Drilling with Intercepts Including 49.0m of 2.13 g/t Au
