Vancouver, Canada – June 16th, 2026 – Antimony Resources Corp. (CSE: ATMY) (OTCQB: ATMYF) (FSE: K8J0) (the “Company” or “Antimony Resources” or “ATMY”) is pleased to announce that it has received assay results from additional drilling in the Main Zone at the Bald Hill Antimony project. The results are from drilling which is part of the more than 18,000 meters of drilling planned for Q2/Q3 2026. A portion of drilling in the expanded drill program is intended to expand the mineralization at the Main Zone to the North and South and to depth.  The remainder of the drill targets will be focused on the New Zones recently identified on the Bald Hill Antimony project.

 

Highlights

 

-          All holes intersected antimony-bearing stibnite in the Main Zone

 

-          Values up to 36.0% Antimony (Sb), 27.0% Sb and 19.8% Sb

 

-          Thickness up to 13.2 meters

 

-          The intersections are at depths up to 240 meters

 

-          The drill hole intersections include multiple zones of mineralization – Hole BHW-26-04 intersected three zones over a drill hole length of 20 meters and BH-26-15 intersected three zones over a drill hole length of 40 meters

 

-          The holes show greater width with drill hole BH-26-15 returning 2.85% Sb over 13.2 meters

 

Table 1: Summary of Assay Results for Samples of Drill Core from the Main Zone at Bald Hill Antimony Project

 

Drill Sample Results - Main Zone Bald Hill

West Side Drilling

Hole Number BHW-26-03

 

From (m)

To (m)

Length (m)

% Sb

Zone 1

80.4

81.7

1.3

2.23

 

 

 

 

 

Zone 2

84.2

85.0

0.8

19.8

Hole Number BHW -26-04

 

From (m)

to (m)

Length (m)

% Sb

Zone 1

100.8

103.0

2.2

0.33

 

 

 

 

 

Zone 2

107.8

108.8

1

1.48

 

 

 

 

 

Zone 3

110.8

121.0

10.3

5.45

including

118.0

121.0

3.0

13.3

 

 

 

 

 

East Side Drilling

Hole Number BH-26-15

 

From (m)

to (m)

Length (m)

% Sb

Zone 1

200.5

207.1

6.6

2.15

including

200.5

202.2

1.7

7.62

 

 

 

 

 

Zone 2

213.1

226.3

13.2

2.85

including

213.1

217.2

4.1

5.45

including

217.9

221.2

3.3

2.86

including

223.3

226.3

3.0

2.85

 

 

 

 

 

Zone 3

237.3

239.5

2.3

8.15

 

A map detailing the locations and geological data of various drill holes for antimony exploration at Bald Hill.

AI-generated content may be incorrect.

Figure 1: Locations of Drill holes BHW 26-03, BHW-26-04 and BH-26-15 at The Main Zone Bald HIll. Note drilling both from the West and East sides intersect the Main Zone and Create “Scissor” Intersections. Only Reported Holes are labeled.  Drill Holes BHW-26-03 and BHW-26-04 were targeted to extend mineralization to the south.

 

Mr. James Atkinson PGeo., CEO of Antimony Resources commented “These assays are from drill holes in the northern and southern parts of the Main Zone. Drill holes BHW-26- 03 and BHW-26-04 were intended to be “scissor holes” cutting the Main Zone from the west side. These holes are also in the southern extent of the Main Zone and were aimed to test the continuity of mineralization in the southern direction.   They successfully intersected antimony mineralization and effectively extended the Main Zone in a southerly direction. 

 

As we have been describing, the current drill program in the Main Zone will be focused on expanding the known mineralization to the south and north and at depth. Exploration in the New Zones is continuing with drilling on the Central Zone with over 1500 meters completed to intersect below the mineralization exposed in surface trenching.” 

 

Table 2: Mineralized Intersections.  The extent of the mineralized zones in BHW-26-03 and BHW-26-04 on the west Side and BH-26-15 from the east Side are reported.

 

Mineralized Intersections

West Side Drilling

BHW 26-03

 

 

 

 

 

SAMPLE

From (m)

To (m)

Length (m)

Sb (ppm)

Sb (%)

Au (ppb)

2304541

80.40

81.00

0.60

> 500

0.217

680

2304542

81.00

81.70

0.70

> 500

3.95

654

 

 

 

 

 

 

 

2304543

81.70

82.50

0.80

286

 

14

2304544

82.50

83.35

0.85

180

 

10

2304545

83.35

83.80

0.45

156

 

11

2304546

83.80

84.20

0.40

194

 

10

2304547

84.20

85.00

0.80

> 500

19.8

852

2304548

85.00

85.40

0.40

255

 

14

2304549

85.40

86.25

0.85

161

 

12

2304151

86.25

87.08

0.83

113

 

12

2304152

87.08

88.10

1.02

242

 

11

2304153

88.10

89.15

1.05

65

 

12

2304154

89.15

90.05

0.90

45

 

8

 

BHW-26-04

 

 

 

 

 

SAMPLE

From (m)

To (m)

Length (m)

Sb (ppm)

Sb (%)

Au (ppb)

2304243

100.80

102.00

1.20

> 500

0.24

98

2304244

102.00

103.00

1.00

> 500

0.43

1040

 

 

 

 

 

 

 

2304251

107.75

108.75

1.00

> 500

1.48

140

 

 

 

 

 

 

 

2304254

110.75

111.75

1.00

> 500

0.59

113

2304255

111.75

112.50

0.75

> 500

0.30

175

2304256

112.50

113.15

0.65

258

0.03

364

2304257

113.15

114.10

0.95

> 500

15.60

384

2304258

114.10

115.00

0.90

> 500

0.24

26

2304259

115.00

116.00

1.00

138

0.01

8

2304261

116.00

117.00

1.00

330

0.03

8

2304262

117.00

118.00

1.00

117

0.01

8

2304263

118.00

119.00

1.00

> 500

0.10

9

2304264

119.00

120.10

1.10

> 500

36.00

771

2304265

120.10

121.00

0.90

> 500

0.23

446

 

East Side Drilling

BH-26-15

 

 

 

 

 

2305039

200.50

201.05

0.55

> 500

0.60

40

2305041

201.05

201.55

0.50

> 500

23.10

701

2305042

201.55

202.20

0.65

> 500

1.65

1020

2305043

202.55

203.80

1.25

477

0.05

729

2305044

203.20

204.10

0.90

128

0.01

60

2305045

204.10

205.10

1.00

> 500

0.06

1860

2305046

205.10

206.10

1.00

> 500

0.79

2320

2305047

206.10

207.10

1.00

> 500

0.30

1610

 

 

 

 

 

 

 

2305055

213.10

214.10

1.00

> 500

2.77

2300

2305056

214.10

214.50

0.40

> 500

0.24

176

2305057

214.50

215.20

0.70

> 500

27.00

1180

2305058

215.20

216.20

1.00

> 500

0.07

120

2305059

216.20

217.20

1.00

> 500

0.53

95

2305061

217.20

217.90

0.70

108

0.01

91

2305062

217.90

218.20

0.30

> 500

23.10

195

2305063

218.20

219.20

1.00

> 500

2.38

392

2305064

219.20

220.20

1.00

159

0.02

75

2305065

220.20

221.20

1.00

> 500

0.12

107

2305066

221.20

222.20

1.00

77

0.01

11

2305067

222.20

223.00

0.80

72

0.01

67

2305068

223.00

223.75

0.75

> 500

0.09

67

2305069

223.75

224.25

0.50

> 500

17.80

382

2305071

224.25

225.25

1.00

> 500

0.17

145

2305072

225.25

226.25

1.00

> 500

0.12

58

 

 

 

 

 

 

 

2305085

237.25

238.25

1.00

> 500

2.01

37

2305086

238.25

238.80

0.55

> 500

0.94

91

2305087

238.80

239.50

0.70

> 500

22.60

423

 

The next phase of exploration at Bald Hill will also include an airborne magnetic and electromagnetic survey, soil sampling and geological mapping.  Further trenching will be completed in areas of interest especially in the New Zones and in any areas where soil sampling indicates anomalous antimony or other metals. Note SR1 and SR2 in figure 3 show areas which returned anomalous antimony results in soil sampling.

 

Figure 2: Areas of known Antimony Mineralization on the Bald Hill Property.  Note: SR1 and SR2 Soil Anomalies are currently being explored while trenching has been completed on the Marcus, Central and South Zones.

 

QA/QC

 

Samples from the drilling rigs are transported to our secure Core Handling Facility where they are examined by our geotechnical staff. Once the information on core conditions including RQD, lost core etc are recorded and the core is confirmed to be intact and orderly it is logged and marked for sampling by our professional geological staff. The marked core for sampling is cut by diamond say one half is returned to the box for safekeeping and one half is placed in plastic bags. The bags are sealed and placed in larger canvas bags for shipment to the Activation Labs Processing facility in Fredericton where they are crushed and prepared for shipment to the assay lab in Ancaster Ontario. The samples are analyzed using Actlabs Method Code 1E3 Aqua Regia ICPOES for the multi element and Code 1A2 Fire Assay AA for gold.

 

Quality Assurance and Quality Control (QA/QC) samples are inserted in the sample runs which include a known standard for antimony and gold, a core duplicate, a blank, and a pulp duplicate. Activation Labs also has standard QA/QC protocols which are reported with each assay batch.

 

Activation Laboratories in an internationally accredited assay Laboratory.

 

Bald Hill Antimony Project - A Project with Significant Antimony Potential

 

Highlights

 

-          Bald Hill is a well-known, high-grade antimony deposit in southern New Brunswick, Canada.

 

-          Assays indicate that Bald Hill is the highest-grade antimony deposit in North America with mineable widths indicated by drilling.

 

-          Drilling has outlined an antimony deposit in the Main Zone over 600 meters long and to a depth of at least 350 meters. The mineralization is open in all directions.

 

-          Widths of mineralization average 4 to 5 meters and grades average 3% to 4% antimony.

 

-          NI-43-101 Technical Report: The estimated potential quantity and grade of the drilled area from the 2025 Technical Report, which is the target of our exploration, is reported in the Technical Reports approximately 2.7 million tonnes with a grade between 3% and 4% antimony1. For more details on the Potential of the project as described by the author of the Technical Report please consult the NI43-101 which has been filed on SEDAR. Antimony Resources Corp. has not completed enough work to confirm this estimate. The potential quantity and grade are conceptual in nature as there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

 

-          Potential to expand based on recently discovered targets and additional claims added to the property to the west, south and east.

 

-          New Zones outlined by Soil Sampling approximately 3 kilometres south of the Main Zone on the newly acquired Second Run Claim.

 

(1) NATIONAL INSTRUMENT 43-101 TECHNICAL REPORT: BALD HILL ANTIMONY PROJECT SOUTHERN NEW BRUNSWICK, CANADA. NTS 21G/09, Prepared for Antimony Resources March 2, 2026. Prepared By John Langton, M.Sc., P. GEO., JPL GeoServices, Fredericton, New Brunswick, Canada.

 

The technical contents of this news release were reviewed and approved by Jim Atkinson, MSc., P. Geo., President and CEO of Antimony Resources Corp. who is a qualified person as defined by National Instrument 43-101.

 

About Antimony Resources Corp. (CSE: ATMY) (OTCQB: ATMYF) (FSE: K8J0)

 

Antimony Resources Corp. is an exploration and development company focused exclusively on Antimony. The Company’s management team possesses extensive experience in financing, exploration, development and mining. The Company is focused on becoming a significant North American producer of antimony.

 

www.antimonyresources.ca

 

On Behalf of the Board of Directors

Jim Atkinson, CEO and President

 

For further information please contact:

Anthony Simone, President, Simone Capital Inc.

416-881-5154, asimone@simonecapital.ca