KK Draft 1 - NR

Vancouver, Canada – June 18, 2026 – Endeavour Silver Corp. (“Endeavour” or the “Company”) (TSX: EDR, NYSE: EXK) - https://www.commodity-tv.com/ondemand/companies/profil/endeavour-silver-corp/ - is pleased to announce positive drill results from its exploration program at its newest mine, Terronera, located in Jalisco, Mexico.

 

Since 2025, the Company has completed 43 drill holes totaling 7,015 metres on the La Luz system and 10 drill holes totaling 1,904 metres targeting the Terronera vein. This marks the first exploration drilling campaign at the Terronera mine since 2020. The program is designed to expand and better define mineralization along strike and at depth within the Terronera vein system. At La Luz, drilling has focused on defining the limits of mineralization adjacent to historical workings and testing the down-dip extension of the system to support mine design and long-term planning. Key highlights from this program include:

 

-          LL-43: 574 g/t Ag, 23.92 g/t Au for 2,607 g/t AgEq over 1.06 metres true width

-          LL-77: 1,271 g/t Ag, 0.81 g/t Au for 1,340 g/t AgEq over 0.94 metres true width

-          TRU-001: 282 g/t Ag, 1.80 g/t Au for 435 g//t AgEq over 8.11 metres true width

-          TRU-003: 150 g/t Ag, 6.30 g/t Au for 686 g/t AgEq over 5.32 metres true width

 

“These results demonstrate the exploration potential that exists beyond the current Terronera mine plan," said Luis Castro, Chief Operating Officer. “At both Terronera and La Luz, drilling has successfully extended mineralization along strike and at depth while supporting the continuity of high-grade silver and gold zones. By advancing mine development, we are better positioned to establish underground drill platforms that allow us to efficiently test priority targets and quickly improve our understanding of the district vein systems. We believe these results highlight the opportunity to grow resources, extend mine life and unlock additional value across the broader Terronera property.”

 

At La Luz, drilling highlights were holes LL-43 LL-77 which underscore the presence of high-grade precious metal mineralization. Holes LL-68, LL-69, LL-75, LL-76, L-77 are all below the published resource extending mineralization along strike and to depth, which continues to remain open. La Luz holes were drilled from 500 metres of the access ramp developed in 2025. The program is designed to better define historical workings to improve the mine design of the La Luz deposit. Management expects the mining of the high grade La Luz deposit will commence in 2027 through a combination of long hole and cut and fill mining methods.

 

Drilling of the Terronera structure continues to return high-grade mineralization, highlighted by hole TRU-001 and hole TRU-003. These results support the presence of robust mineralized zones with both strong grades and meaningful widths, further supporting the continuity and quality of mineralization within the Terronera system. The Terronera holes extend mineralized vein continuity along strike and to depth. TRU-006 is the deepest high-grade intercept in this zone, while TRU-10 demonstrates the structure continues at depth. Terronera remains open along strike and at depth.

 

Two drill rigs are currently operating at Terronera and are expected to continue testing the extension of mineralization along strike and at depth through the middle of the fourth quarter. The program is designed to further define the continuity and potential expansion of the Terronera vein system, supporting future resource growth and mine planning initiatives.

 

Table 1. La Luz Drill Results

 

Hole

Structure

From

To

Core Length

True Width

Au

Ag

AgEq

(m)

(m)

(m)

(m)

(gpt)

(gpt)

(gpt)

LL-43

La Luz

104.10

105.40

1.30

1.06

23.92

574

2,607

Including

104.70

105.40

0.70

0.57

44.40

1,060

4,834

LL-44

La Luz

120.10

123.05

2.95

2.26

3.84

176

503

Including

122.60

123.05

0.45

0.34

18.15

817

2,360

LL-48

La Luz

124.85

126.40

1.55

0.95

1.08

8

100

Including

125.55

126.40

0.85

0.52

1.93

10

173

LL-49

La Luz

77.00

78.35

1.35

1.3

3.43

579

871

Including

77.00

78.00

1.00

0.93

4.47

741

1,121

LL-50

La Luz

78.00

79.25

1.25

1.20

0.47

80

120

Including

78.00

78.60

0.60

0.57

0.86

123

196

LL-51

La Luz

139.10

141.25

2.15

0.94

1.99

27

196

Including

140.60

141.25

0.65

0.28

3.75

41

360

LL-52

La Luz

151.35

153.55

2.20

1.13

15.86

55

1,404

Including

152.65

153.55

0.90

0.46

18.40

76

1,640

LL-55

La Luz

84.50

86.10

1.60

1.31

1.66

19

160

Including

85.15

86.10

0.95

0.78

2.77

30

266

LL-59

La Luz

135.10

137.40

2.30

2.12

7.47

378

1,013

Including

135.10

135.85

0.75

0.69

17.90

440

1,962

LL-61

La Luz

138.00

140.20

2.20

2.07

0.65

93

148

Including

139.75

140.20

0.45

0.42

0.53

233

278

LL-63

La Luz

155.65

156.60

0.95

0.86

0.65

426

481

Including

155.65

156.00

0.35

0.32

1.68

1,145

1,287

LL-67

La Luz

146.80

148.35

1.55

1.37

2.01

115

285

Including

147.00

147.65

0.65

0.57

4.62

224

617

LL-68

La Luz

180.50

182.00

1.50

1.19

1.12

252.8

348

Including

180.50

181.50

1.00

0.79

1.55

330

461

LL-69

La Luz

204.90

206.50

1.60

1.13

0.31

172

198

Including

205.70

206.50

0.80

0.57

0.43

243

280

LL-74

La Luz

130.00

131.70

1.70

1.50

2.41

149.5

354

Including

130.85

131.70

0.85

0.75

3.68

104

417

LL-75

La Luz

174.55

176.45

1.90

1.41

0.36

231

262

Including

174.80

175.60

0.80

0.59

0.44

336

373

LL-76

La Luz

234.00

235.80

1.80

1.14

0.26

195

218

Including

235.15

235.80

0.65

0.41

0.68

512

570

LL-77

La Luz

183.85

185.20

1.35

0.94

0.81

1,271

1,340

Including

183.85

184.45

0.60

0.42

1.80

2,830

2,983

LL-81

La Luz

145.20

146.70

1.50

1.32

0.25

131.5

153

Including

145.20

145.95

0.75

0.66

0.29

155

179

LL-82

La Luz

120.75

121.75

1.00

0.96

0.52

86

129

Including

120.75

121.25

0.50

0.48

0.28

131

155

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; m: metre.

 

AgEq is calculated using an 85:1 Au:Ag ratio

 

Drill holes LL-46, LL-47, LL-54, LL-56, LL-57, LL-64, LL-70, LL-71, LL-73, LL-78, LL-79, LL-80, LL-83, and LL-84 returned no significant results.

 

9 drill holes LL-42, LL45, LL-53, LL-58, LL-60, LL-62, LL-65, LL-66 and LL-72 intersected historical working as part of the boundary definition of the La Luz vein.

 

Longitudinal Section of La Luz Vein (Overlain on Figure 10-5 NI 43-101 Technical Report May 15, 2023)

 

 

Table 2. Terronera Drill Results

 

Hole

Structure

From

To

Core Length

True Width

Au

Ag

AgEq

(m)

(m)

(m)

(m)

(gpt)

(gpt)

(gpt)

TRU-001

Terronera

121.40

131.55

10.15

8.11

1.80

282

435

Including

122.20

123.50

1.30

1.04

0.49

1290

1,332

TRU-002

Terronera

125.80

132.50

6.70

5.09

2.07

80

256

Including

131.90

132.50

0.60

0.46

3.24

197

472

TRU-003

Terronera

109.20

118.60

9.40

5.32

6.30

150

686

Including

110.20

110.80

0.60

0.34

12.70

240

1,320

TRU-004

Terronera

86.40

92.40

6.00

4.42

4.05

119

463

Including

88.80

89.90

1.10

0.81

9.29

204

994

TRU-005

Terronera

150.25

159.50

9.25

4.20

1.93

216

380

Including

151.45

152.05

0.60

0.27

1.19

924

1,025

TRU-006

Terronera

201.70

208.30

6.60

2.20

3.10

130

393

Including

204.60

205.40

0.80

0.27

14.70

240

1,490

TRU-007

Terronera

182.45

187.30

4.85

1.82

1.33

99

211

Including

182.45

182.75

0.30

0.11

5.02

111

538

TRU-008

Terronera

156.50

161.50

5.00

2.07

5.50

156

624

Including

159.50

160.25

0.75

0.31

14.60

353

1,594

TRU-009

Terronera

147.10

155.90

8.80

4.20

3.41

89

379

Including

147.90

148.70

0.80

0.38

13.50

320

1,468

TRU-010

Terronera

208.20

211.50

3.30

0.99

0.09

14

21

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; m: metre.

 

AgEq is calculated using an 85:1 Au:Ag ratio

 

All drill holes in the Terronera vein have been included in the ‘Drill Results’ table.

 

Figure 2. Longitudinal Section of Terronera Vein (Overlain on Figure 10-4 NI 43-101 Technical Report May 15, 2023)

 

 

About Endeavour Silver

 

Endeavour is a mid-tier silver producer with three operating mines in Mexico and Peru and a robust pipeline of exploration projects across Mexico, Chile, and the United States. With a proven track record of discovery, development, and responsible mining, Endeavour is driving organic growth and creating lasting value on its path to becoming a leading senior silver producer.

 

Qualified Person

 

Dale Mah, P.Geo., Vice President Corporate Development, a qualified person under NI 43-101, has approved the scientific and technical information contained in this news release.

 

During 2025, the majority of the drill core samples were shipped to ALS Limited in Zacatecas, Mexico for sample preparation and then for analysis at the ALS laboratory in North Vancouver; at the end of 2025, the laboratory was changed to SGS laboratory in Durango, Mexico for sample preparation and analysis. The 2026 campaign has been completely analyzed by SGS laboratory. The ALS Zacatecas, North Vancouver facilities and SGS laboratory are ISO 9001 and/or ISO/IEC 17025 certified.

 

A quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay results. All samples are split at the local field office and shipped to ALS and/or SGS laboratories, where they are dried, crushed, split and 250-gram pulp samples are prepared for analysis. Gold was assayed by 30-gram fire assay with atomic absorption (“AA”) spectroscopy finish and silver by aqua regia digestion with ICP-AES / ICP-OES finish, over-limits analyses by fire assay and gravimetric finish.

 

Contact Information

 

Allison Pettit

Vice President, Investor Relations

Tel: (604) 685 - 9775

Email: apettit@edrsilver.com

Website: www.edrsilver.com

 

In Europe

Swiss Resource Capital AG

Marc Ollinger

info@resource-capital.ch

www.resource-capital.ch

 

Cautionary Note Regarding Forward-Looking Statements

 

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to statements regarding the Company’s exploration and drilling plans and programs at Terronera, exploration potential at Terronera, the opportunity to grow resources, extend mine life and unlock additional value across the Terronera property, mining at La Luz and related timing, Terronera’s potential to create shareholder value, the opportunity for mineral discovery, the Company’s path to becoming a leading senior silver producer and the timing and results of various activities. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to changes in production and costs guidance; the ongoing effects of inflation and supply chain issues on mine economics; changes in national and local governments’ legislation, taxation, controls, regulations and political or economic developments in Peru, Canada and Mexico; financial risks due to precious metals prices; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development; risks in obtaining necessary licenses and permits; fluctuations in the prices of silver and gold, fluctuations in the currency markets (particularly the Peruvian sol, Mexican peso, Chilean peso, Canadian dollar and U.S. dollar); and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

 

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.