FortunaMining_13-10-2026_ENPRcom

Vancouver, British Columbia, October 13, 2026: Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) - https://www.commodity-tv.com/ondemand/companies/profil/fortuna-mining-inc/ - is pleased to report updated results from exploration drilling at the Southern Arc and Kassasoko deposits at the Diamba Sud Gold Project located in Senegal, and the start of drilling at Kabewest on the recently acquired and contiguous Bambadji properties.

 

Paul Weedon, Senior Vice President of Exploration, commented, “The recently completed reverse circulation and diamond drilling program adjacent to the Southern Arc and Kassasoko deposits has continued to return very encouraging results beyond the current pit designs. Results such as the 3.9 g/t Au intersection over an estimated true width of 40.8 meters from 228 meters in drill hole DSR1149 highlight the opportunity to further expand the Diamba Sud Mineral Reserve.” Mr. Weedon continued, “At our recently acquired Bambadji properties, exploration drilling has commenced at Kabewest, with six drill rigs operating as part of an $8 million drilling campaign for the remainder of 2026. Kabewest is the largest and most advanced drill-defined target on the property and is located only 2.3 kilometres from the proposed Diamba Sud plant site. Initial drill core samples have highlighted strong similarities to the breccia-hosted mineralization at Diamba Sud, and we look forward to receiving the assay results.”

 

Southern Arc Drilling highlights

 

DSDD699:

6.8 g/t Au

18.9 g/t Au

22.6 g/t Au

over an estimated true width of 12.0 meters from 96 meters, including

over an estimated true width of 2.4 meters from 98 meters, and

over an estimated true width of 0.8 meters from 103 meters

DSDD715:

2.4 g/t Au

11.5 g/t Au

2.8 g/t Au

24.6 g/t Au

12.1 g/t Au

over an estimated true width of 28.0 meters from 92 meters, including

over an estimated true width of 0.8 meters from 124 meters

over an estimated true width of 20.8 meters from 155 meters, including

over an estimated true width of 0.8 meters from 169 meters, and

over an estimated true width of 0.8 meters from 180 meters

DSDD792:

 

 

 

 

 

 

 

5.0 g/t Au

24.8 g/t Au

3.9 g/t Au

25.2 g/t Au

11.6 g/t Au

21.1 g/t Au

1.9 g/t Au

11.8 g/t Au

over an estimated true width of 7.2 meters from 154 meters, including

over an estimated true width of 0.8 meters from 162 meters

over an estimated true width of 17.6 meters from 186 meters, including

over an estimated true width of 0.8 meters from 187 meters, and

over an estimated true width of 0.8 meters from 195 meters, and

over an estimated true width of 0.8 meters from 198 meters

over an estimated true width of 13.6 meters from 216 meters, including

over an estimated true width of 0.8 meters from 227 meters

DSDD799:

1.8 g/t Au

24.5 g/t Au

over an estimated true width of 56.8 meters from 26 meters, including

over an estimated true width of 0.8 meters from 85 meters

 

DSR1149:

1.4 g/t Au

3.9 g/t Au

10.2 g/t Au

17.3 g/t Au

17.4 g/t Au

11.3 g/t Au

over an estimated true width of 18.4 meters from 187 meters

over an estimated true width of 40.8 meters from 228 meters, including

over an estimated true width of 0.8 meters from 248 meters, and

over an estimated true width of 1.6 meters from 261 meters, and

over an estimated true width of 0.8 meters from 272 meters, and

over an estimated true width of 0.8 meters from 274 meters

DSR1128:

7.8 g/t Au

59.5 g/t Au

29.8 g/t Au

over an estimated true width of 12.8 meters from 103 meters, including

over an estimated true width of 0.8 meters from 112 meters, and

over an estimated true width of 0.8 meters from 114 meters

DSR1132:

4.5 g/t Au

59.7 g/t Au

13.9 g/t Au

over an estimated true width of 20.0 meters from 65 meters, including

over an estimated true width of 0.8 meters from 69 meters, and

over an estimated true width of 0.8 meters from 76 meters

 

Since the previous exploration results update in February 2026, a further 196 reverse circulation (“RC”) and diamond drilling (“DD”) holes, totalling 36,592 meters, have been completed at Southern Arc (refer to Figure 1), concluding the program (refer to Fortuna news release dated February 25, 2026, “Fortuna intersects 6.0 g/t gold over 24.1 meters at Southern Arc, Diamba Sud Project, Senegal”). The program successfully identified depth and strike extensions to the northeast and southwest, as well as parallel structures to the southeast, where mineralization remains open. For example, DSR1132 intersected 4.5 g/t gold over an estimated true width of 20.0 meters from 65 meters within a broad zone of mineralization beyond the current pit design (refer to Figure 2). This zone remains open at depth, further demonstrating the open nature of the mineralization. An updated estimate is intended to be prepared for Mineral Resource and Mineral Reserve reporting as at year-end, and further step-out drilling is planned for 2027.

 

Mineralization at Southern Arc occurs as variable fine stockwork vein arrays and diffuse pyrite-silica flooding, with a strong spatial association to hydrothermal breccias and carbonate units. The system commonly exhibits extensive hematite alteration, consistent with mineralization observed at other Diamba Sud deposits.

 

Figure 1: Diamba Sud Gold Project: Location of Mineral Resource Deposits and Exploration Targets

 

 

Figure 2: Diamba Sud Gold Project: Southern Arc Deposit, Long Section 375NE

 

 

Kassasoko Drilling Highlights

 

DSR1119:

5.0 g/t Au

19.1 g/t Au

2.9 g/t Au

8.1 g/t Au

21.9 g/t Au

over an estimated true width of 5.6 meters from 88 meters, including

over an estimated true width of 0.8 meters from 88 meters

over an estimated true width of 5.6 meters from 131 meters

over an estimated true width of 5.6 meters from 146 meters, including

over an estimated true width of 1.6 meters from 146 meters

DSR1122:

3.5 g/t Au

19.8 g/t Au

8.8 g/t Au

17.2 g/t Au

over an estimated true width of 11.2 meters from 49 meters, including

over an estimated true width of 0.8 meters from 54 meters

over an estimated true width of 1.6 meters from 137 meters, including

over an estimated true width of 0.8 meters from 137 meters

 

DSR1157:

2.8 g/t Au

3.0 g/t Au

13.5 g/t Au

19.3 g/t Au

28.3 g/t Au

3.3 g/t Au

11.3 g/t Au

over an estimated true width of 9.6 meters from 75 meters

over an estimated true width of 27.2 meters from 95 meters, including

over an estimated true width of 0.8 meters from 110 meters, and

over an estimated true width of 0.8 meters from 112 meters, and 

over an estimated true width of 0.8 meters from 116 meters

over an estimated true width of 3.2 meters from 178 meters, including

over an estimated true width of 0.8 meters from 181 meters

DSR1169:

 

DSR1171:

4.8 g/t Au

22.3 g/t Au

1.0 g/t Au

1.9 g/t Au

22.3 g/t Au

over an estimated true width of 11.2 meters from 139 meters, including 

over an estimated true width of 0.8 meters from 141 meters

over an estimated true width of 16.8 meters from 96 meters

over an estimated true width of 24 meters from 160 meters, including

over an estimated true width of 0.8 meters from 182 meters

A program of 53 RC and DD holes, totalling 8,787 meters, has been completed at Kassasoko since the previous exploration update. This program was designed to test for expansion of the mineralized footprint through step-out drilling and evaluate its link to the nearby Western Splay deposit. Mineralization remains open at depth and along strike.

 

Mineralization at Kassasoko occurs within intercalated hydrothermal breccias, carbonate metasedimentary units, and granitic to dioritic intrusive rocks. It is typically associated with vein arrays preferentially hosted within hydrothermal breccias.

 

Bambadji, Senegal: Exploration Work Program

 

Drilling has commenced on the recently acquired Bambadji project (refer to Figure 3), with five DD rigs and 1 RC rig currently operating as part of an $8 million, 51,000-meter exploration program for the balance of 2026 (refer to Fortuna news release dated August 10, 2026, “Fortuna acquires highly prospective Bambadji Project in Senegal from Barrick and IAMGOLD”).

 

Figure 3: Bambadji Gold Project: Location of Exploration Targets

 

 

Note: Probable Mineral Reserves of 20.5 million tonnes averaging 1.75 g/t Au, containing 1.15 million ounces of gold have been reported for Diamba Sud (refer to Fortuna news release dated June 29, 2026, “Fortuna delivers robust Feasibility Study for the Diamba Sud Gold Project in Senegal: After-tax IRR of 60% and NPV5% of US$1 billion using US$3,500/oz”).

 

Following an extensive data review, more than eight drill-ready targets have been identified and prioritized for drilling in 2026. Six drill rigs are currently operating at Kabewest, the most advanced target, located approximately 2.3 kilometers from the proposed Diamba Sud plant site. An initial Inferred Mineral Resource estimate for Kabewest is expected to be included in the Company’s annual Mineral Reserve and Mineral Resource update, planned for publication in the first quarter of 2027. Drilling will progressively advance to additional prospects, including Fatima, Djenebou, Latifa, Kach, Wari, and Kabetea, throughout the remainder of 2026 and into the first half of 2027.

 

In addition, work is continuing to further refine targets for the 2027 field season across the more than 60-kilometer strike length of the newly acquired permits. Three highly prospective mineralized trends have been identified based on geophysical and geochemical data and supported by field mapping. Limited historical drilling was generally shallow and widely spaced, with several multi-kilometer gaps along these anomalous gold trends providing compelling targets for Fortuna’s 2026 and 2027 exploration programs.

 

Geological logging of the initial DD holes at Kabewest has highlighted strong similarities to the nearby Diamba Sud style of mineralization, including extensive hydrothermal brecciation, hematite-silica alteration, and pyrite development (refer to Figure 4), consistent with mineralization previously modelled by Barrick (refer to Figure 5). Assay results are pending.

 

Integration of the former Barrick technical staff into Fortuna’s Senegal exploration team has been successfully completed, providing valuable continuity, supporting the rapid advancement of field and drilling activities, and enhancing the Company’s understanding of the region’s broader geological architecture.

 

Figure 4: Examples of hydrothermal breccia from Kabewest highlighting similarities to the Area D mineralization style at Diamba Sud

 

 

For full details of drill hole DSDD385, refer to Fortuna news release dated May 27, 2025 “Fortuna drills 8.6 g/t gold over 13.6 meters at Southern Arc prospect, Diamba Sud Project, Senegal”.

 

Figure 5: Cross section 150SW through Kabewest highlighting historic mineralized interval

 

 

Note: For historic drilling details, refer to Fortuna news release dated August 10, 2026 “Fortuna acquires highly prospective Bambadji Project in Senegal from Barrick and IAMGOLD”

 

Refer to Appendix 1 for full details of the drill holes and assay results for this drill program.

 

Quality Assurance & Quality Control (QA - QC)

 

All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

 

All reverse circulation (RC) drilling used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5 percent representative sample for submission to the analytical laboratory. The residual 87.5 percent samples were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company-controlled core yard.

 

All diamond drilling (DD) drill holes started with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

 

All RC and DD samples were transported by Company vehicle or commercial courier to ALS Global’s preparation laboratories in Kedougou, Senegal with prepared sample pulps then transported via commercial courier to ALS Global’s analytical facility in Ouagadougou, Burkina Faso. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed for all samples. Samples returning assays >10 ppm Au were reanalyzed using a 50-gram charge and fire assay with a gravimetric finish. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the ALS Global laboratory inserted its own quality control samples.

 

Qualified Person

 

Paul Weedon, Senior Vice President, Exploration for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

 

About Fortuna Mining Corp.

 

Fortuna Mining Corp. is a Canadian precious metals mining company with three operating mines in Argentina, Côte d’Ivoire, and Peru, and the feasibility-stage Diamba Sud Gold Project in Senegal. Our exploration portfolio spans our operating jurisdictions as well as Guinea and Guyana. Sustainability is at the core of our operations and stakeholder relationships. We produce gold and silver while creating long-term shared value through efficient production, environmental stewardship, and social responsibility. For more information, please visit our website at www.fortunamining.com

 

ON BEHALF OF THE BOARD

Jorge A. Ganoza

CEO and Director

Fortuna Mining Corp.

 

Investor Relations:

 

Carlos Baca | info@fmcmail.com | fortunamining.com | X | LinkedIn | YouTube | Instagram | TikTok

 

In Europe

 

Swiss Resource Capital AG

Marc Ollinger

info@resource-capital.ch

www.resource-capital.ch

 

Forward looking Statements

 

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements about the Company’s plans for its mines and mineral properties; statements regarding the development of the Diamba Sud project, including the proposed plant site, that an updated Mineral Resource and Mineral Reserve estimate is intended to be prepared for year-end, and drilling plans for 2027; statements that an initial Inferred Mineral Resource estimate for Kabewest is expected in the first quarter of 2027; the Company’s drilling plans at the Bambadji project; the Company’s business strategy, plans and outlook; the merit of the Company’s mines and mineral properties; the future financial or operating performance of the Company; the Company’s ability to comply with contractual and permitting or other regulatory requirements; approvals and other matters. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated,” “potential,” “open,” “future,” “assumed,” “projected,” “used,” “detailed,” “has been,” “gain,” “planned,” “reflecting,” “will,” “anticipated,” “estimated,” “containing,” “remaining,” “to be,” or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.

 

Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, operational risks associated with mining and mineral processing; uncertainty relating to Mineral Resource and Mineral Reserve estimates; uncertainty relating to capital and operating costs, production schedules and economic returns; risks relating to the Company’s ability to replace its Mineral Reserves; risks associated with mineral exploration and project development; uncertainty relating to the repatriation of funds as a result of currency controls; environmental matters including obtaining or renewing environmental permits and potential liability claims; uncertainty relating to nature and climate conditions; laws and regulations regarding the protection of the environment (including greenhouse gas emission reduction and other decarbonization requirements and the uncertainty surrounding the interpretation of omnibus Bill C-59 and the related amendments to the Competition Act (Canada); risks associated with political instability and changes to the regulations governing the Company’s business operations; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in countries in which the Company does or may carry on business; risks associated with war, hostilities or other conflicts, such as the Ukrainian – Russian, Israel- – Hamas, and Iran – Israel and United States conflicts, and the impacts such conflicts may have on global economic activity; risks relating to the termination of the Company’s mining concessions in certain circumstances; developing and maintaining relationships with local communities and stakeholders; risks associated with losing control of public perception as a result of social media and other web-based applications; potential opposition to the Company’s exploration, development and operational activities; risks related to the Company’s ability to obtain adequate financing for planned exploration and development activities; property title matters; risks relating to the integration of businesses and assets acquired by the Company; impairments; risks associated with climate change legislation; reliance on key personnel; adequacy of insurance coverage; operational safety and security risks; legal proceedings and potential legal proceedings; uncertainties relating to general economic conditions; risks relating to a global pandemic, which could impact the Company’s business, operations, financial condition and share price; competition; fluctuations in metal prices; risks associated with entering into commodity forward and option contracts for base metals production; fluctuations in currency exchange rates and interest rates; tax audits and reassessments; risks related to hedging; uncertainty relating to concentrate treatment charges and transportation costs; sufficiency of monies allotted by the Company for land reclamation; risks associated with dependence upon information technology systems, which are subject to disruption, damage, failure and risks with implementation and integration; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events, or results to differ from those anticipated, estimated or intended.

 

Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to the accuracy of the Company’s current Mineral Resource and Mineral Reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or its production estimates (which assume accuracy of projected head grade, mining rates, recovery timing, and recovery rate estimates and may be impacted by unscheduled maintenance, labor and contractor availability and other operating or technical difficulties); the duration and effect of global and local inflation; geo-political uncertainties on the Company’s production, workforce, business, operations and financial condition; the expected trends in mineral prices, inflation and currency exchange rates; that all required approvals and permits will be obtained for the Company’s business and operations on acceptable terms including for the construction of a mine at the Diamba Sud Project and the underground mining method at the Séguéla Mine; that there will be no significant disruptions affecting the Company’s operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events, or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

 

Cautionary Note to United States Investors Concerning Mineral Resources and Mineral Reserves

 

Technical disclosure regarding the Company’s properties included herein has been prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. Canadian standards, including NI 43-101, differ from the requirements of the Securities and Exchange Commission, and information included herein may not be comparable to similar information disclosed by U.S. companies.

 

Appendix 1: Diamba Sud Gold Project, Senegal: Drill program details and assay results

 

HoleID

Easting (WGS84_29N)

Northing (WGS84_29N)

Elev.                              (m)

EOH1,2                Depth                      (m)

UTM               Azimuth

Dip

Depth2,3                     From                        (m)

Depth2                      To (m)

Drilled2               Width                       (m)

ETW4                        (m)

Au (ppm)

Hole                                        Type5

Area

DSDD726

231544

1425966

144

94

150

-55

78

87

9

7.20

1.5

DD

Kassasoko

DSDD729

231589

1425904

145

112

150

-55

27

28

1

0.80

7.6

DD

Kassasoko

 

 

 

 

 

 

 

38

66

28

22.40

0.7

DD

Kassasoko

 

 

 

 

 

 

Including

41

42

1

Core Loss

 

DD

Kassasoko

DSDD734

231566

1425922

145

101

150

-55

15

23

8

6.40

1.3

DD

Kassasoko

 

 

 

 

 

 

 

30

40

10

8.00

0.5

DD

Kassasoko

DSDD737

231793

1425932

144

80

150

-55

NSI

 

 

 

 

DD

Kassasoko

DSDD770

231535

1426150

147

204

270

-50

110

117

7

5.60

2.1

DD

Kassasoko

 

 

 

 

 

 

 

195

204

9

7.20

0.6

DD

Kassasoko

DSDD774

231556

1426104

146

186

150

-50

120

150

30

24.00

0.6

DD

Kassasoko

 

 

 

 

 

 

 

170

185

15

12.00

1.8

DD

Kassasoko

DSDD781

231443

1426104

143

198

150

-50

NSI

 

 

 

 

DD

Kassasoko

DSDD787

231569

1426186

147

198

150

-50

NSI

 

 

 

 

DD

Kassasoko

DSDD808

231414

1426157

146

269

150

-50

61

68

7

5.60

3.3

DD

Kassasoko

 

 

 

 

 

 

 

74

83

9

7.20

2.2

DD

Kassasoko

 

 

 

 

 

 

 

96

113

17

13.60

1.3

DD

Kassasoko

DSDD812

231497

1426133

146

254

150

-50

141

145

4

3.20

1.7

DD

Kassasoko

 

 

 

 

 

 

 

207

216

9

7.20

2.1

DD

Kassasoko

 

 

 

 

 

 

Including

211

212

1

0.80

10.9

DD

Kassasoko

 

 

 

 

 

 

 

228

230

2

1.60

3.6

DD

Kassasoko

DSDD815

231480

1426163

146

289

150

-50

180

186

6

4.80

1.1

DD

Kassasoko

 

 

 

 

 

 

 

217

237

20

16.00

0.8

DD

Kassasoko

DSDD820

231352

1426175

146

305

150

-50

NSI

 

 

 

 

DD

Kassasoko

DSR1065

231531

1425934

145

114

150

-50

38

40

2

1.60

2.9

RC

Kassasoko

DSR1066

231518

1425911

145

108

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1067

231600

1425810

144

117

150

-50

13

20

7

5.60

3.3

RC

Kassasoko

 

 

 

 

 

 

Including

14

15

1

0.80

13.6

RC

Kassasoko

DSR1068

231626

1425811

144

108

150

-50

 

 

 

 

 

RC

Kassasoko

DSR1069

231529

1425834

144

100

150

-55

45

62

17

13.60

0.5

RC

Kassasoko

 

 

 

 

 

 

 

71

76

5

4.00

2.8

RC

Kassasoko

 

 

 

 

 

 

Including

73

74

1

0.80

12.2

RC

Kassasoko

DSR1070

231544

1425812

144

88

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1071

231693

1425835

144

130

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1072

231643

1425968

143

108

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1073

231629

1425998

143

120

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1074

231660

1425993

143

162

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1075

231577

1426003

144

90

150

-55

NSI

 

 

 

 

RC

Kassasoko

DSR1116

231549

1426126

147

168

150

-50

113

114

1

0.80

6.3

RC

Kassasoko

 

 

 

 

 

 

 

124

157

33

26.40

1.4

RC

Kassasoko

DSR1117

231518

1426168

148

200

150

-50

88

90

2

1.60

3.9

RC

Kassasoko

 

 

 

 

 

 

 

111

121

10

8.00

1.4

RC

Kassasoko

DSR1118

231424

1426137

145

168

150

-50

53

67

14

11.20

0.7

RC

Kassasoko

 

 

 

 

 

 

 

76

77

1

0.80

5.9

RC

Kassasoko

 

 

 

 

 

 

 

93

111

18

14.40

2.7

RC

Kassasoko

 

 

 

 

 

 

Including

110

111

1

0.80

28.2

RC

Kassasoko

 

 

 

 

 

 

 

162

167

5

4.00

3.5

RC

Kassasoko

 

 

 

 

 

 

Including

164

165

1

0.80

14.0

RC

Kassasoko

DSR1119

231406

1426176

142

186

150

-50

88

95

7

5.60

5.0

RC

Kassasoko

 

 

 

 

 

 

Including

88

89

1

0.80

19.1

RC

Kassasoko

 

 

 

 

 

 

 

131

138

7

5.60

2.9

RC

Kassasoko

 

 

 

 

 

 

 

146

153

7

5.60

8.1

RC

Kassasoko

 

 

 

 

 

 

Including

146

148

2

1.60

21.9

RC

Kassasoko

DSR1120

231818

1426064

145

132

150

-50

63

68

5

4.00

1.6

RC

Kassasoko

DSR1121

231788

1426107

146

198

150

-50

8

16

8

6.40

1.4

RC

Kassasoko

 

 

 

 

 

 

 

142

151

9

7.20

0.9

RC

Kassasoko

DSR1122

231769

1426152

145

180

150

-50

49

63

14

11.20

3.5

RC

Kassasoko

 

 

 

 

 

 

Including

54

55

1

0.80

19.8

RC

Kassasoko

 

 

 

 

 

 

 

137

139

2

1.60

8.8

RC

Kassasoko

 

 

 

 

 

 

Including

137

138

1

0.80

17.2

RC

Kassasoko

DSR1123

231740

1426196

148

150

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1124

231714

1426235

149

186

150

-50

77

85

8

6.40

1.0

RC

Kassasoko

DSR1127

231642

1426374

150

162

150

-50

135

142

7

5.60

1.7

RC

Kassasoko

DSR1153

231703

1426155

147

150

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1154

231676

1426197

148

150

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1155

231651

1426247

149

186

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1156

231739

1426118

147

150

150

-50

100

101

1

0.80

6.6

RC

Kassasoko

DSR1157

231627

1426099

146

182

150

-50

75

87

12

9.60

2.8

RC

Kassasoko

 

 

 

 

 

 

 

95

129

34

27.20

3.0

RC

Kassasoko

 

 

 

 

 

 

Including

110

111

1

0.80

13.5

RC

Kassasoko

 

 

 

 

 

 

And

112

113

1

0.80

19.3

RC

Kassasoko

 

 

 

 

 

 

And

116

117

1

0.80

28.3

RC

Kassasoko

 

 

 

 

 

 

 

137

150

13

10.40

0.9

RC

Kassasoko

 

 

 

 

 

 

 

178

182

4

3.20

3.3

RC

Kassasoko

 

 

 

 

 

 

Including

181

182

1

0.80

11.3

RC

Kassasoko

DSR1158

231600

1426128

147

180

150

-50

90

121

31

24.80

1.3

RC

Kassasoko

 

 

 

 

 

 

Including

108

109

1

0.80

10.6

RC

Kassasoko

 

 

 

 

 

 

 

129

151

22

17.60

0.7

RC

Kassasoko

DSR1159

231836

1426125

147

174

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1160

231819

1426166

147

210

150

-50

78

81

3

2.40

2.0

RC

Kassasoko

DSR1161

231581

1426063

145

184

150

-50

147

161

14

11.20

0.6

RC

Kassasoko

 

 

 

 

 

 

 

168

184

16

12.80

0.5

RC

Kassasoko

DSR1162

231549

1426033

144

162

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1163

231436

1426031

145

180

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1164

231461

1425987

145

150

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1165

231413

1425968

146

126

150

-50

NSI

 

 

 

 

RC

Kassasoko

DSR1166

231529

1426082

146

192

150

-50

184

192

8

6.40

1.1

RC

Kassasoko

DSR1167

231683

1426099

145

162

150

-50

82

99

17

13.60

1.1

RC

Kassasoko

 

 

 

 

 

 

 

130

135

5

4.00

1.1

RC

Kassasoko

 

 

 

 

 

 

 

146

162

16

12.80

2.1

RC

Kassasoko

DSR1168

231655

1426144

147

192

150

-50

84

90

6

4.80

1.7

RC

Kassasoko

 

 

 

 

 

 

 

140

148

8

6.40

0.6

RC

Kassasoko

 

 

 

 

 

 

 

170

177

7

5.60

1.1

RC

Kassasoko

DSR1169

231629

1426187

148

180

150

-50

139

153

14

11.20

4.8

RC

Kassasoko

 

 

 

 

 

 

Including

141

142

1

0.80

22.3

RC

Kassasoko

 

 

 

 

 

 

 

168

176

8

6.40

0.9

RC

Kassasoko

DSR1170

231608

1426226

149

204

150

-50

151

156

5

4.00

1.4

RC

Kassasoko

 

 

 

 

 

 

 

166

186

20

16.00

2.1

RC

Kassasoko

 

 

 

 

 

 

Including

177

178

1

0.80

10.2

RC

Kassasoko

DSR1171

231584

1426271

149

204

150

-50

96

117

21

16.80

1.0

RC

Kassasoko

 

 

 

 

 

 

 

129

134

5

4.00

1.2

RC

Kassasoko

 

 

 

 

 

 

 

148

154

6

4.80

1.4

RC

Kassasoko

 

 

 

 

 

 

 

160

190

30

24.00

1.9

RC

Kassasoko

 

 

 

 

 

 

Including

182

183

1

0.80

22.3

RC

Kassasoko

DSR1172

231389

1426012

145

204

150

-50

188

190

2

1.60

3.9

RC

Kassasoko

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DSR1111

233734

1425582

143

156

150

-60

NSI

 

 

 

 

RC

Kouroudiako

DSR1112

233692

1425646

142

174

150

-60

34

44

10

8.00

0.5

RC

Kouroudiako

DSR1113

233901

1425531

147

144

150

-60

NSI

 

 

 

 

RC

Kouroudiako

DSR1114

233851

1425607

147

174

150

-60

56

63

7

5.60

0.9

RC

Kouroudiako

DSR1115

233773

1425835

147

138

150

-60

46

59

13

10.40

1.1

RC

Kouroudiako

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DSDD670

231065

1426675

153

132

270

-55

93

103

10

8.00

1.8

DD

Moungoundi

 

 

 

 

 

 

 

115

123.7

8.7

6.96

1.9

DD

Moungoundi

DSDD673

231065

1426650

152

215

270

-55

114

119

5

4.00

1.1

DD

Moungoundi

DSDD675

230793

1426847

153

119

90

-55

41

45

4

3.20

2.4

DD

Moungoundi

DSDD679

230765

1426844

152

149

90

-55

13

14

1

0.80

6.4

DD

Moungoundi

 

 

 

 

 

 

 

104

124

20

16.00

0.8

DD

Moungoundi

DSDD682

230957

1426720

152

104

90

-55

NSI

 

 

 

 

DD

Moungoundi

DSDD684

230890

1426730

152

162

90

-55

NSI

 

 

 

 

DD

Moungoundi

DSDD762

232644

1425974

141

215

150

-50

145

154

9

7.20

1.1

DD

Moungoundi

 

 

 

 

 

 

 

170

197

27

21.60

1.6

DD

Moungoundi

DSDD764

231012

1426621

151

152

270

-55

NSI

 

 

 

 

DD

Moungoundi

DSDD767

231086

1426651

152

224

270

-55

81

100

19

15.20

1.5

DD

Moungoundi

DSDD772

231089

1426674

152

197

270

-55

63

69

6

4.80

4.1

DD

Moungoundi

 

 

 

 

 

 

 

95

115

20

16.00

0.8

DD

Moungoundi

 

 

 

 

 

 

 

121

127

6

4.80

0.9

DD

Moungoundi

DSDD778

230963

1426629

150

226

270

-55

NSI

 

 

 

 

DD

Moungoundi

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DSDD470

232763

1426110

144

322

150

-50

138

141

3

2.40

3.7

RCD

Southern Arc

 

 

 

 

 

 

 

270

307

37

29.60

1.0

RCD

Southern Arc

DSDD668

232210

1426169

145

168

150

-50

72

84

12

9.60

1.4

DD

Southern Arc

 

 

 

 

 

 

Including

83

84

1

0.80

13.6

DD

Southern Arc

DSDD669

232662

1426136

144

159

150

-50

107

108

1

0.80

5.8

DD

Southern Arc

DSDD671

232698

1426119

145

231

150

-50

148

150

2

1.60

2.9

DD

Southern Arc

 

 

 

 

 

 

 

197

204

7

5.60

1.0

DD

Southern Arc

DSDD672

232239

1426074

145

84

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD674

232314

1426105

143

176

150

-50

37

54.2

17.2

13.76

1.2

DD

Southern Arc

DSDD676

232910

1426021

143

138

150

-50

39

46

7

5.60

0.8

DD

Southern Arc

 

 

 

 

 

 

 

57

77.2

20.2

16.16

0.5

DD

Southern Arc

DSDD677

232298

1426137

143

210

150

-50

34

42

8

6.40

1.4

DD

Southern Arc

 

 

 

 

 

 

 

63

74

11

8.80

1.0

DD

Southern Arc

 

 

 

 

 

 

 

85

101

16

12.80

0.7

DD

Southern Arc

 

 

 

 

 

 

 

208

210

2

1.60

3.7

DD

Southern Arc

DSDD678

232882

1426046

143

171

150

-50

28

33

5

4.00

6.9

DD

Southern Arc

 

 

 

 

 

 

Including

30

32

2

1.60

15.8

DD

Southern Arc

DSDD680

232864

1426338

143

297

150

-50

83

87

4

3.20

4.3

DD

Southern Arc

 

 

 

 

 

 

 

93

99

6

4.80

12.9

DD

Southern Arc

 

 

 

 

 

 

Including

93

94

1

0.80

31.1

DD

Southern Arc

 

 

 

 

 

 

And

97

99

2

1.60

22.8

DD

Southern Arc

DSDD681

232267

1426457

148

225

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD683

232818

1426343

143

264

150

-50

109

132

23

18.40

1.2

DD

Southern Arc

 

 

 

 

 

 

 

195

202

7

5.60

0.8

DD

Southern Arc

DSDD685

232913

1426341

143

263

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD686

232867

1425933

143

266

150

-50

175

191

16

12.80

0.6

DD

Southern Arc

DSDD689

232887

1426336

143

291

150

-50

203

206

3

2.40

36.9

DD

Southern Arc

 

 

 

 

 

 

Including

205

206

1

0.80

108.5

DD

Southern Arc

DSDD690

232795

1426332

143

344

150

-50

100

112

12

9.60

0.9

DD

Southern Arc

 

 

 

 

 

 

 

167

180

13

10.40

4.5

DD

Southern Arc

 

 

 

 

 

 

 

229

231

2

1.60

3.0

DD

Southern Arc

DSDD691

232842

1425923

143

215

150

-50

127

145

18

14.40

0.6

DD

Southern Arc

DSDD692

232850

1426294

143

290

150

-48

126

134

8

6.40

2.9

DD

Southern Arc

 

 

 

 

 

 

 

222

241

19

15.20

0.7

DD

Southern Arc

DSDD694

232910

1426297

143

231

150

-50

121

124

3

2.40

3.2

DD

Southern Arc

DSDD695

232881

1425946

143

215

150

-50

137

156

19

15.20

0.6

DD

Southern Arc

 

 

 

 

 

 

 

164

203

39

31.20

0.7

DD

Southern Arc

DSDD696

232789

1426398

143

288

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD697

232861

1426383

143

291

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD698

232943

1425938

143

200

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD699

232761

1426377

144

330

150

-50

96

111

15

12.00

6.8

DD

Southern Arc

 

 

 

 

 

 

Including

98

101

3

2.40

18.9

DD

Southern Arc

 

 

 

 

 

 

And

103

104

1

0.80

22.6

DD

Southern Arc

DSDD700

232831

1426378

143

273

150

-50

184

197

13

10.40

1.1

DD

Southern Arc

DSDD702

232973

1425978

143

187

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD703

233162

1425965

141

183

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD704

232723

1426413

145

393

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD705

233047

1426115

141

198

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD707

232783

1425818

141

180

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD708

233121

1426186

145

249

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD709

232760

1425810

140

215

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD710

232395

1426062

142

219

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD711

232888

1425895

143

264

150

-50

17

31

14

11.20

0.6

DD

Southern Arc

 

 

 

 

 

 

 

100

146

46

36.80

0.7

DD

Southern Arc

 

 

 

 

 

 

 

208

215

7

5.60

1.0

DD

Southern Arc

DSDD712

232429

1426086

141

243

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD713

232731

1425763

141

212

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD715

232355

1426010

142

207

150

-50

92

127

35

28.00

2.4

DD

Southern Arc

 

 

 

 

 

 

Including

124

125

1

0.80

11.5

DD

Southern Arc

 

 

 

 

 

 

 

155

181

26

20.80

2.8

DD

Southern Arc

 

 

 

 

 

 

Including

169

170

1

0.80

24.6

DD

Southern Arc

 

 

 

 

 

 

And

180

181

1

0.80

12.1

DD

Southern Arc

DSDD716

232705

1425808

141

227

150

-50

152

158

6

4.80

0.9

DD

Southern Arc

DSDD717

232873

1425886

142

222

150

-50

111

116

5

4.00

1.5

DD

Southern Arc

 

 

 

 

 

 

 

154

168

14

11.20

0.6

DD

Southern Arc

DSDD718

232333

1426070

143

264

150

-50

116

137

21

16.80

2.3

DD

Southern Arc

DSDD719

232908

1425905

143

264

150

-50

44

53

9

7.20

0.8

DD

Southern Arc

 

 

 

 

 

 

 

164

173

9

7.20

1.0

DD

Southern Arc

 

 

 

 

 

 

 

237

256

19

15.20

1.1

DD

Southern Arc

DSDD720

232737

1425854

145

260

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD722

232370

1426101

145

204

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD723

232749

1425928

142

264

150

-50

70

91

21

16.80

2.2

DD

Southern Arc

 

 

 

 

 

 

Incliding

86

87

1

0.80

23.5

DD

Southern Arc

DSDD725

232405

1426126

141

225

150

-50

49

64

15

12.00

0.8

DD

Southern Arc

DSDD727

232761

1425866

141

151

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD728

232812

1425922

143

144

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD730

232463

1426123

142

186

150

-50

43

52

9

7.20

0.8

DD

Southern Arc

DSDD731

232740

1425900

141

183

150

-50

53

72

19

15.20

0.5

DD

Southern Arc

DSDD732

232289

1426047

143

141

150

-50

33

37

4

3.20

1.3

DD

Southern Arc

DSDD733

232822

1425853

142

182

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD735

232654

1425897

141

171

150

-50

121

158

37

29.60

1.4

DD

Southern Arc

DSDD736

232267

1426084

141

192

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD738

232543

1425979

142

102

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD739

232258

1426133

144

153

150

-50

26

34

8

6.40

1.0

DD

Southern Arc

DSDD740

232496

1425964

142

81

150

-50

6

12

6

4.80

1.1

DD

Southern Arc

DSDD741

232151

1426016

144

144

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD742

232240

1426128

144

168

150

-50

20

23

3

2.40

5.2

DD

Southern Arc

DSDD743

232340

1425998

147

210

150

-50

186

201

15

12.00

0.5

DD

Southern Arc

DSDD744

233075

1425803

141

123

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD745

232287

1426094

144

165

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD746

232382

1425975

141

186

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD747

232665

1425928

140

182

150

-50

106

113

7

5.60

1.2

DD

Southern Arc

 

 

 

 

 

 

 

140

161

21

16.80

0.8

DD

Southern Arc

DSDD748

232713

1425897

140

154

150

-50

108

111

3

2.40

2.1

DD

Southern Arc

 

 

 

 

 

 

 

117

120

3

2.40

5.3

DD

Southern Arc

DSDD749

232330

1426127

142

150

150

-50

18

20

2

1.60

4.0

DD

Southern Arc

DSDD750

232399

1426003

142

147

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD751

232628

1425937

141

179

150

-50

153

159

6

4.80

4.6

DD

Southern Arc

 

 

 

 

 

 

Including

153

154

1

0.80

14.6

DD

Southern Arc

DSDD752

232678

1425899

140

188

150

-50

117

129

12

9.60

1.2

DD

Southern Arc

DSDD753

232316

1426150

142

159

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD754

232385

1426027

142

153

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD755

232603

1425982

141

150

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD756

232364

1426145

142

168

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD757

232434

1426029

141

150

150

-50

49

50

1

0.80

7.8

DD

Southern Arc

DSDD758

232667

1425983

141

224

150

-50

138

140

2

1.60

3.4

DD

Southern Arc

 

 

 

 

 

 

 

160

193

33

26.40

2.0

DD

Southern Arc

DSDD759

232689

1425885

140

227

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD760

232348

1426172

142

210

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD761

232350

1425980

142

237

150

-50

212

220

8

6.40

0.6

DD

Southern Arc

DSDD763

232954

1425816

142

257

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD765

232582

1426027

141

224

150

-50

196

207

11

8.80

3.6

DD

Southern Arc

 

 

 

 

 

 

Including

202

203

1

0.80

16.1

DD

Southern Arc

DSDD766

232442

1426164

142

168

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD768

232307

1425953

143

228

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD769

232618

1426018

141

197

150

-50

129

131

2

1.60

6.0

DD

Southern Arc

 

 

 

 

 

 

including

130

131

1

0.80

11.0

DD

Southern Arc

DSDD771

233026

1425893

143

233

150

-50

185

204

19

15.20

0.7

DD

Southern Arc

DSDD773

232277

1425996

143

246

150

-50

199

221

22

17.60

1.0

DD

Southern Arc

DSDD775

232683

1426107

144

248

150

-50

71

78

7

5.60

2.3

DD

Southern Arc

 

 

 

 

 

 

 

170

176

6

4.80

1.6

DD

Southern Arc

 

 

 

 

 

 

 

229

236

7

5.60

0.9

DD

Southern Arc

DSDD776

232994

1425839

142

62

150

-50

8

9

1

0.80

5.5

DD

Southern Arc

DSDD777

233019

1425797

141

71

150

-50

13

21

8

6.40

0.8

DD

Southern Arc

 

 

 

 

 

 

 

48

56

8

6.40

1.6

DD

Southern Arc

DSDD779

232678

1425859

141

221

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD780

232959

1425763

141

164

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD782

232646

1426073

143

173

150

-50

79

89

10

8.00

0.8

DD

Southern Arc

 

 

 

 

 

 

 

102

110

8

6.40

1.2

DD

Southern Arc

DSDD783

232801

1426050

143

287

150

-50

68

91

23

18.40

0.9

DD

Southern Arc

 

 

 

 

 

 

 

118

133

15

12.00

2.3

DD

Southern Arc

 

 

 

 

 

 

 

152

169

17

13.60

1.7

DD

Southern Arc

 

 

 

 

 

 

including

166

167

1

0.80

20.1

DD

Southern Arc

 

 

 

 

 

 

 

189

193

4

3.20

1.7

DD

Southern Arc

 

 

 

 

 

 

 

249

260

11

8.80

0.8

DD

Southern Arc

DSDD784

232685

1426009

142

198

150

-50

97

129

32

25.60

0.6

DD

Southern Arc

DSDD785

232914

1425794

141

185

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD786

232613

1425868

142

178

150

-50

103

113

10

8.00

0.6

DD

Southern Arc

 

 

 

 

 

 

 

121

132

11

8.80

0.7

DD

Southern Arc

 

 

 

 

 

 

 

139

149

10

8.00

1.5

DD

Southern Arc

DSDD788

232874

1426318

143

251

150

-50

184

189

5

4.00

1.2

DD

Southern Arc

 

 

 

 

 

 

 

206

218

12

9.60

1.2

DD

Southern Arc

DSDD789

232808

1426316

143

299

150

-50

89

109

20

16.00

1.9

DD

Southern Arc

 

 

 

 

 

 

Including

90

91

1

0.80

14.4

DD

Southern Arc

 

 

 

 

 

 

 

171

182

11

8.80

0.9

DD

Southern Arc

 

 

 

 

 

 

 

223

225

2

1.60

6.2

DD

Southern Arc

DSDD790

232935

1426264

143

234

150

-50

191

224

33

26.40

1.9

DD

Southern Arc

 

 

 

 

 

 

Including

191

192

1

0.80

10.2

DD

Southern Arc

 

 

 

 

 

 

And

195

196

1

0.80

16.4

DD

Southern Arc

 

 

 

 

 

 

And

197

198

1

Core Loss

 

DD

Southern Arc

DSDD791

232643

1425918

141

185

150

-50

151

168

17

13.60

0.7

DD

Southern Arc

DSDD792

232988

1426224

143

255

150

-50

154

163

9

7.20

5.0

DD

Southern Arc

 

 

 

 

 

 

including

162

163

1

0.80

24.8

DD

Southern Arc

 

 

 

 

 

 

 

169

175

6

4.80

2.4

DD

Southern Arc

 

 

 

 

 

 

 

186

208

22

17.60

3.9

DD

Southern Arc

 

 

 

 

 

 

including

187

188

1

0.80

25.2

DD

Southern Arc

 

 

 

 

 

 

And

195

196

1

0.80

11.6

DD

Southern Arc

 

 

 

 

 

 

And

198

199

1

0.80

21.1

DD

Southern Arc

 

 

 

 

 

 

 

216

233

17

13.60

1.9

DD

Southern Arc

 

 

 

 

 

 

including

227

228

1

0.80

11.8

DD

Southern Arc

DSDD793

232665

1425874

141

152

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD794

232898

1426317

143

228

150

-50

140

143

3

2.40

3.2

DD

Southern Arc

DSDD795

232680

1425959

141

189

150

-50

127

144

17

13.60

0.8

DD

Southern Arc

 

 

 

 

 

 

 

157

184

27

21.60

1.1

DD

Southern Arc

DSDD797

232909

1425847

142

206

150

-50

32

42

10

8.00

1.0

DD

Southern Arc

 

 

 

 

 

 

 

72

77

5

4.00

1.5

DD

Southern Arc

DSDD798

232698

1425914

140

171

150

-50

96

112

16

12.80

0.5

DD

Southern Arc

DSDD799

232798

1426194

144

209

150

-50

26

97

71

56.80

1.8

DD

Southern Arc

 

 

 

 

 

 

Including

85

86

1

0.80

24.5

DD

Southern Arc

 

 

 

 

 

 

 

121

125

4

3.20

1.6

DD

Southern Arc

 

 

 

 

 

 

 

149

177

28

22.40

0.6

DD

Southern Arc

DSDD800

232852

1425988

143

254

150

-50

96

112

16

12.80

0.9

DD

Southern Arc

 

 

 

 

 

 

 

141

165

24

19.20

2.0

DD

Southern Arc

 

 

 

 

 

 

 

198

216

18

14.40

0.6

DD

Southern Arc

 

 

 

 

 

 

 

224

239

15

12.00

3.7

DD

Southern Arc

 

 

 

 

 

 

Including

229

230

1

0.80

44.2

DD

Southern Arc

DSDD801

232704

1425962

140

195

150

-50

114

129

15

12.00

1.0

DD

Southern Arc

DSDD802

232934

1425863

142

267

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD803

232712

1426242

145

182

150

-50

57

60

3

2.40

2.0

DD

Southern Arc

DSDD804

232623

1426048

142

237

150

-50

150

172

22

17.60

1.0

DD

Southern Arc

DSDD805

232696

1426135

145

254

150

-50

74

84

10

8.00

1.2

DD

Southern Arc

 

 

 

 

 

 

 

98

100

2

1.60

3.0

DD

Southern Arc

DSDD806

232932

1425807

142

173

150

-50

117

131

14

11.20

0.7

DD

Southern Arc

DSDD369

232795

1426236

144

227

150

-50

147

164

17

13.60

0.7

DD

Southern Arc

DSDD498

232713

1426154

145

246

150

-50

84.3

89.65

5.35

4.28

1.9

DD

Southern Arc

DSDD559

232753

1426132

145

180

150

-50

154

171

17

13.60

2.2

DD

Southern Arc

DSDD586

232536

1426234

145

263

150

-50

51.85

57

5.15

4.12

1.0

DD

Southern Arc

DSDD594

232561

1426182

144

242

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD601

232738

1426112

145

246

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD624

232671

1426026

142

240

150

-50

121

136

15

12.00

0.9

DD

Southern Arc

DSDD807

232885

1425838

142

184

150

-50

85

93

8

6.40

0.7

DD

Southern Arc

DSDD809

232898

1425926

143

308

150

-50

58

60

2

1.60

4.1

DD

Southern Arc

 

 

 

 

 

 

 

91

105

14

11.20

0.7

DD

Southern Arc

 

 

 

 

 

 

 

134

140

6

4.80

1.2

DD

Southern Arc

 

 

 

 

 

 

 

278

287

9

7.20

0.6

DD

Southern Arc

DSDD810

232341

1426379

147

216

150

-50

58

67

9

7.20

1.8

DD

Southern Arc

 

 

 

 

 

 

 

74

75

1

0.80

5.8

DD

Southern Arc

DSDD811

232743

1426424

144

228

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD813

232828

1425952

143

164

150

-50

71

83

12

9.60

0.8

DD

Southern Arc

DSDD814

232760

1425908

142

117

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD816

232786

1425921

143

80

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD818

232878

1425918

143

195

150

-50

33

51

18

14.40

0.6

DD

Southern Arc

 

 

 

 

 

 

 

93

149

56

44.80

0.8

DD

Southern Arc

DSDD819

232815

1425880

143

60

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD821

232785

1425862

142

80

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSDD822

232773

1425882

142

104

150

-50

NSI

 

 

 

 

DD

Southern Arc

DSR1006

232779

1426089

145

319

150

-50

180

221

41

32.80

1.6

RCD

Southern Arc

 

 

 

 

 

 

 

262

285

23

18.40

2.6

RCD

Southern Arc

 

 

 

 

 

 

Including

283

284

1

0.80

23.5

RCD

Southern Arc

DSR1008

232738

1426160

145

204

150

-50

170

177

7

5.60

3.4

RCD

Southern Arc

DSR1149

232777

1426038

143

283

150

-50

121

131

10

8.00

1.5

RCD

Southern Arc

 

 

 

 

 

 

 

143

151

8

6.40

1.1

RCD

Southern Arc

 

 

 

 

 

 

 

187

210

23

18.40

1.4

RCD

Southern Arc

 

 

 

 

 

 

 

228

279

51

40.80

3.9

RCD

Southern Arc

 

 

 

 

 

 

Including

248

249

1

0.80

10.2

RCD

Southern Arc

 

 

 

 

 

 

And

261

263

2

1.60

17.3

RCD

Southern Arc

 

 

 

 

 

 

And

272

273

1

0.80

17.4

RCD

Southern Arc

 

 

 

 

 

 

And

274

275

1

0.80

11.3

RCD

Southern Arc

DSR1150

232830

1426035

144

292

150

-50

32

41

9

7.20

2.6

RCD

Southern Arc

 

 

 

 

 

 

 

115

124

9

7.20

2.0

RCD

Southern Arc

 

 

 

 

 

 

Including

121

122

1

0.80

10.6

RCD

Southern Arc

 

 

 

 

 

 

 

202

215

13

10.40

2.0

RCD

Southern Arc

 

 

 

 

 

 

Including

202

203

1

0.80

10.9

RCD

Southern Arc

DSR1152

232802

1425994

143

256

150

-50

82

98

16

12.80

1.1

RCD

Southern Arc

 

 

 

 

 

 

 

109

121

12

9.60

3.4

RCD

Southern Arc

 

 

 

 

 

 

Including

111

112

1

0.80

22.2

RCD

Southern Arc

 

 

 

 

 

 

 

150

161

11

8.80

0.7

RCD

Southern Arc

DSR968

232631

1426148

145

290

150

-50

122

123

1

0.80

8.1

RCD

Southern Arc

 

 

 

 

 

 

 

169

178

9

7.20

5.0

RCD

Southern Arc

 

 

 

 

 

 

Including

170

171

1

0.80

23.4

RCD

Southern Arc

 

 

 

 

 

 

 

184

198

14

11.20

1.1

RCD

Southern Arc

DSR970

232789

1426068

144

281

150

-50

140

154

14

11.20

4.7

RCD

Southern Arc

 

 

 

 

 

 

Including

141

142

1

0.80

15.9

RCD

Southern Arc

 

 

 

 

 

 

And

149

150

1

0.80

17.6

RCD

Southern Arc

 

 

 

 

 

 

 

183

194

11

8.80

0.5

RCD

Southern Arc

DSR972

232814

1426027

144

244

150

-50

121

156

35

28.00

1.4

RCD

Southern Arc

 

 

 

 

 

 

 

181

187

6

4.80

3.8

RCD

Southern Arc

 

 

 

 

 

 

Including

182

183

1

Core Loss

 

RCD

Southern Arc

 

 

 

 

 

 

 

203

225

22

17.60

1.3

RCD

Southern Arc

DSR1076

232692

1425941

140

148

150

-50

101

121

20

16.00

2.5

RC

Southern Arc

 

 

 

 

 

 

Including

102

103

1

0.80

15.5

RC

Southern Arc

DSR1077

232714

1425941

141

154

150

-50

53

64

11

8.80

0.7

RC

Southern Arc

 

 

 

 

 

 

 

89

115

26

20.80

2.0

RC

Southern Arc

 

 

 

 

 

 

 

131

147

16

12.80

1.3

RC

Southern Arc

DSR1078

233003

1425811

142

108

150

-50

2

17

15

12.00

1.0

RC

Southern Arc

DSR1079

232978

1425861

142

162

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1080

233054

1425847

142

132

150

-50

117

127

10

8.00

0.7

RC

Southern Arc

DSR1081

233162

1425859

140

120

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1082

233398

1425652

140

120

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1083

233328

1425773

141

126

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1084

233301

1425818

141

144

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1085

233020

1425504

144

122

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1086

232994

1425549

143

120

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1087

232925

1425672

140

156

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1088

232587

1425907

142

150

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1089

232560

1425950

142

160

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1090

232541

1425889

142

120

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1091

232434

1425883

142

171

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1092

232405

1425926

142

126

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1093

232346

1425826

143

144

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1094

232305

1425699

147

144

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1095

232245

1425609

150

150

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1096

232225

1425657

148

144

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1097

232109

1425636

146

132

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1098

231995

1425634

149

138

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1099

231971

1425679

147

132

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1100

232034

1425769

144

174

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1101

232201

1425867

142

156

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1102

232104

1425833

142

126

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1103

232898

1426472

142

150

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1104

233125

1426945

142

66

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1105

233097

1426541

142

180

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1106

233077

1426577

144

132

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1107

233134

1426673

145

174

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1108

233214

1426543

143

132

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1109

233282

1426816

145

120

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1110

233248

1426861

147

126

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1128

232779

1426359

144

150

150

-50

103

119

16

12.80

7.8

RC

Southern Arc

 

 

 

 

 

 

Including

112

113

1

0.80

59.5

RC

Southern Arc

 

 

 

 

 

 

And

114

115

1

0.80

29.8

RC

Southern Arc

DSR1129

233014

1426184

143

155

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1130

233030

1426151

143

140

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1131

232929

1425978

143

96

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1132

232730

1425919

142

150

150

-50

65

90

25

20.00

4.5

RC

Southern Arc

 

 

 

 

 

 

Including

69

70

1

0.80

59.7

RC

Southern Arc

 

 

 

 

 

 

And

76

77

1

0.80

13.9

RC

Southern Arc

 

 

 

 

 

 

 

100

110

10

8.00

0.8

RC

Southern Arc

DSR1133

232662

1426048

143

162

150

-50

77

90

13

10.40

0.8

RC

Southern Arc

 

 

 

 

 

 

 

149

159

10

8.00

0.7

RC

Southern Arc

DSR1134

232514

1426136

143

90

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1135

232757

1426260

144

84

150

-50

38

48

10

8.00

2.2

RC

Southern Arc

DSR1136

232733

1426297

145

96

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1137

232853

1426062

144

120

150

-50

50

77

27

21.60

1.7

RC

Southern Arc

 

 

 

 

 

 

Including

75

76

1

0.80

17.2

RC

Southern Arc

DSR1138

232874

1426025

143

102

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1139

232919

1425989

143

111

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1140

232829

1426095

144

120

150

-50

80

86

6

4.80

2.7

RC

Southern Arc

 

 

 

 

 

 

 

95

98

3

2.40

2.0

RC

Southern Arc

DSR1141

232830

1426134

144

155

150

-50

18

50

32

25.60

2.7

RC

Southern Arc

 

 

 

 

 

 

Including

35

36

1

0.80

22.4

RC

Southern Arc

 

 

 

 

 

 

 

74

82

8

6.40

3.4

RC

Southern Arc

DSR1142

232731

1426209

145

150

150

-50

48

57

9

7.20

2.6

RC

Southern Arc

DSR1143

232678

1426264

146

138

150

-50

15

22

7

5.60

2.1

RC

Southern Arc

 

 

 

 

 

 

 

46

52

6

4.80

1.0

RC

Southern Arc

 

 

 

 

 

 

 

60

67

7

5.60

7.6

RC

Southern Arc

 

 

 

 

 

 

Including

62

63

1

0.80

44.2

RC

Southern Arc

DSR1144

233137

1425890

141

144

150

-50

105

110

5

4.00

1.2

RC

Southern Arc

DSR1145

232646

1426302

146

96

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1146

232728

1426286

145

80

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1147

232364

1426355

147

114

150

-50

0

47

47

37.60

2.8

RC

Southern Arc

 

 

 

 

 

 

Including

10

11

1

0.80

18.7

RC

Southern Arc

 

 

 

 

 

 

And

18

19

1

0.80

14.0

RC

Southern Arc

DSR1148

232808

1426067

144

110

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1151

232825

1426005

143

102

150

-50

NSI

 

 

 

 

RC

Southern Arc

DSR1152

232798

1425995

143

256

150

-50

82

98

16

12.80

1.1

RC

Southern Arc

 

 

 

 

 

 

 

109

121

12

9.60

3.4

RC

Southern Arc

 

 

 

 

 

 

Including

111

112

1

0.80

22.2

RC

Southern Arc

 

 

 

 

 

 

 

150

161

11

8.80

0.7

RC

Southern Arc

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DSDD687

230925

1426394

147

128

90

-60

NSI

 

 

 

 

DD

Western Splay

DSDD688

230935

1426350

146

180

90

-55

148

171

23

18.40

1.1

DD

Western Splay

DSDD693

230989

1426323

146

95

90

-50

7

16

9

7.20

0.9

DD

Western Splay

DSDD701

230969

1426293

143

113

90

-55

NSI

 

 

 

 

DD

Western Splay

DSDD706

231238

1426275

145

122

90

-50

NSI

 

 

 

 

DD

Western Splay

DSDD714

231287

1426347

148

92

90

-50

NSI

 

 

 

 

DD

Western Splay

DSDD721

231243

1426255

144

110

90

-50

NSI

 

 

 

 

DD

Western Splay

DSDD724

231229

1426400

149

107

90

-60

NSI

 

 

 

 

DD

Western Splay

 

Notes:

1. EOH: End of hole

2. Depths and widths reported to nearest significant decimal place

3. NSI: No significant intercepts

4. ETW: Estimated true width

5. RC: reverse circulation drilling | DD: diamond drilling tail | RCD: reverse circulation drilling with diamond tail