Osisko Gold Confirms Presence of Mineralized System with Open Pit Potential at the Proserpine Target on the Cariboo Gold Project's Regional Property; Exploration Drilling Highlights Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46 g/t Au over 8.60 m at 77 m Vertical Depth

 

HIGHLIGHTS

 

-          6,463 m in 14 drill holes of new surface exploration drilling at the Proserpine regional exploration target, located 7 km along strike to the southeast of the Cariboo Gold deposit

 

-          Results confirm the presence of an emerging gold mineralized system comprising high-grade structures exhibiting similarities to those at the Cariboo Gold deposit that, together with broader zones of lower-grade mineralization, may indicate potential for open pit mining methods

 

-          Highlight intercepts include: 95.93 g/t Au over 4.60 m at 71 m vertical depth (including 873.00 g/t Au over 0.50 m), 5.46 g/t Au over 8.60 m at 77 m vertical depth, and 2.17 g/t Au over 14.45 m at 431 m vertical depth

 

-          Drilling of an additional 26,500 m planned metres, initially with three rigs, is now resuming following a seasonal hiatus

 

Toronto, Ontario, August 5, 2026 – Osisko Gold Group Inc. (NYSE: OGG, TSXV: OGG) ("Osisko Gold" or the "Company") - https://www.commodity-tv.com/ondemand/companies/profil/osisko-gold-group-inc/ - is pleased to announce its first set of new diamond drilling results consisting of fourteen holes from the surface exploration program on the Proserpine regional greenfield target, located within the broader Cariboo Gold Project property boundary and approximately 7 kilometres ("km") from the Company's permitted, 100%-owned Cariboo Gold Project (the "Project") in central British Columbia, Canada.

 

Chris Lodder, President, stated, “We are encouraged by the initial results from the drill campaign at Proserpine, which highlight the potential for a significant new gold mineralized system of scale located only 7 km from the Cariboo Gold deposit. Drilling has intersected high-grade structures showing similarities to those at Cariboo, but also containing areas with broader lower grade mineralization that may indicate potential for bulk mining methods. To date, drilling has broadly tested an area measuring approximately 1.0 km x 0.5 km within a larger target of 6.0 km x 1.0 km gold-in-soil and rock anomaly. For context, the currently defined Cariboo Gold deposit extends approximately 4.0 km along strike by 0.5 km in width, underscoring the exploration potential that remains to be tested at Proserpine."

 

DRILL ASSAY HIGHLIGHTS

 

This news release contains assays from fourteen (14) diamond drillholes ("DD") totalling 6,463 meters ("m") with depths ranging from 36.0 to 734.3 m (see Table 1 and Figure 3) completed between February and May of 2026. All holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advancing. Estimated true widths of intercepts are provided in Table 1. Select highlights include:

 

  • 95.93 grams per tonne ("g/t") gold ("Au") over 4.60 m at 71 m vertical depth in PSP-26-004, including:

   873.00 g/t Au over 0.50 m, and

   3.77 g/t Au over 1.20 m

 

  • 5.46 g/t Au over 8.60 m at 77 m vertical depth in PSP-26-001 (Figure 1), including:

   16.05 g/t Au over 1.10 m, and

   12.50 g/t Au over 0.87 m, and

   10.25 g/t Au over 0.50 m, and

   5.97 g/t Au over 0.70 m, and

   5.21 g/t Au over 0.80 m, and

   3.36 g/t Au over 0.60 m, and

   1.50 g/t Au over 0.90 m, and

   1.18 g/t Au over 0.90 m

 

  • 2.17 g/t Au over 14.45 m at 431 m vertical depth in PSP-26-001, including:

   35.10 g/t Au over 0.65 m, and

   8.61 g/t Au over 0.50 m, and

   2.21 g/t Au over 0.50 m, and

   1.21 g/t Au over 0.50 m

 

  • 1.46 g/t Au over 12.40 m at 295 m vertical depth in PSP-26-003, including:

   15.40 g/t Au over 1.00 m, and

   2.02 g/t Au over 0.50 m

 

  • 3.17 g/t Au over 5.45 m at 334 m vertical depth in PSP-26-009, including:

   19.30 g/t Au over 0.60 m, and

   9.52 g/t Au over 0.50 m, and

   1.22 g/t Au over 0.50 m

 

  • 1.30 g/t Au over 12.00 m at 27 m vertical depth in PSP-26-011, including:

   9.92 g/t Au over 0.70 m, and

   6.19 g/t Au over 0.50 m, and

   3.63 g/t Au over 0.50 m, and

   3.75 g/t Au over 0.50 m, and

   1.50 g/t Au over 0.65 m

 

  • 2.93 g/t Au over 5.15 m at 233 m vertical depth in PSP-26-001, including:

   15.60 g/t Au over 0.95 m

 

  • 4.30 g/t Au over 3.10 m at 226 m vertical depth in PSP-26-001, including:

   18.75 g/t Au over 0.50 m, and

   7.54 g/t Au over 0.50 m

 

  • 2.79 g/t Au over 4.00 m at 184 m vertical depth in PSP-26-014, including:

   11.55 g/t Au over 0.90 m

 

  • 2.30 g/t Au over 4.50 m at 17 m vertical depth in PSP-26-007, including:

   12.25 g/t Au over 0.50 m, and

   5.62 g/t Au over 0.50 m, and

   1.73 g/t Au over 0.50 m, and

   1.09 g/t Au over 0.50 m

 

Results to date have expanded the footprint of known mineralization at Proserpine to approximately 1.0 km along strike by 0.5 km in width, with mineralization remaining open in all directions. All drill holes that reached their intended target depths encountered mineralization, providing a compelling basis for systematic follow-up drilling. Mineralization was encountered from near surface to vertical depths exceeding 400 metres. In particular, hole PSP-26-001 returned several notable mineralized intercepts beginning at a vertical depth of approximately 55 metres and with the deepest at more than 400 metres from surface.

 

FIGURE 1: 5.46 g/t Au over 8.6 m in PSP-26-001 at approximately 77 m vertical depth.

 

 

Drilling also intersected significant intervals of the prospective siliceous sandstone unit, confirming its presence within the target area and providing additional information to refine the geologic model. Based on preliminary observations to date, the siliceous sandstone is believed to represent a more favourable host for mineralization than the calcareous sandstone (see Figure 3).

 

Diamond drilling at Proserpine has resumed with three active drill rigs following a brief, planned seasonal hiatus. Additional drill rigs may be mobilized as warranted as the planned drill program continues to expand the mineralized footprint and increase drillhole density at Proserpine Southeast, while initiating first-pass drilling at previously untested targets at Proserpine Northwest.

 

FIGURE 2: Cariboo Gold regional overview.

 

 

FIGURE 3: Plan view of Proserpine diamond drilling with select intercept highlights.

 

 

FIGURE 4: Proserpine diamond drilling select intercept highlights in long section.

 

 

TABLE 1: Select manual composite and individual sample highlights greater than or equal to 1.0 g/t Au.

 

Drillhole ID

 

From (m)

To (m)

Length (m)

Au g/t

Est. True Width (m)

Approx. Vertical Depth (m)

PSP-26-001

 

71.50

72.15

0.65

1.16

0.42

55

 

 

79.70

83.60

3.90

1.18

2.95

62

 

Including

80.20

81.30

1.10

2.71

 

 

 

and

83.05

83.60

0.55

1.67

 

 

 

 

97.00

105.60

8.60

5.46

6.51

77

 

Including

97.50

98.20

0.70

5.97

 

 

 

and

98.20

99.00

0.80

5.21

 

 

 

and

100.73

101.60

0.87

12.50

 

 

 

and

101.60

102.70

1.10

16.05

 

 

 

and

102.70

103.20

0.50

10.25

 

 

 

and

103.20

104.10

0.90

1.50

 

 

 

and

104.10

105.00

0.90

1.18

 

 

 

and

105.00

105.60

0.60

3.36

 

 

 

 

146.40

147.10

0.70

1.49

0.35

112

 

 

165.95

166.70

0.75

1.60

0.58

126

 

 

288.95

289.60

0.65

1.23

0.56

219

 

 

290.45

290.95

0.50

1.11

0.45

220

 

 

297.80

300.90

3.10

4.30

2.46

226

 

Including

297.80

298.30

0.50

7.54

 

 

 

and

300.40

300.90

0.50

18.75

 

 

 

 

304.70

309.85

5.15

2.93

3.95

233

 

Including

304.70

305.65

0.95

15.60

 

 

 

 

312.70

313.25

0.55

1.21

0.42

237

 

 

334.80

335.30

0.50

1.74

0.38

254

 

 

343.95

344.45

0.50

3.98

0.32

261

 

 

494.70

495.20

0.50

3.04

0.41

376

 

 

559.85

562.35

2.50

1.04

2.11

420

 

Including

561.85

562.35

0.50

4.53

 

 

 

 

572.00

586.45

14.45

2.17

11.80

431

 

Including

574.25

574.75

0.50

1.21

 

 

 

and

574.75

575.25

0.50

2.21

 

 

 

and

577.55

578.20

0.65

35.10

 

 

 

and

585.45

585.95

0.50

8.61

 

 

 

 

591.50

593.00

1.50

1.10

0.96

440

PSP-26-002

 

15.50

16.00

0.50

1.00

0.38

12

 

 

36.60

37.20

0.60

2.57

0.39

26

 

 

47.00

47.50

0.50

3.25

0.32

34

 

 

52.10

52.60

0.50

1.20

0.35

37

 

 

73.50

74.50

1.00

2.54

0.82

52

 

Including

74.00

74.50

0.50

4.68

 

 

 

 

89.70

90.20

0.50

2.83

0.35

63

 

 

95.10

95.60

0.50

1.04

0.25

67

 

 

165.90

166.40

0.50

1.33

0.25

115

 

 

179.60

180.10

0.50

1.61

0.46

124

 

 

194.20

194.95

0.75

1.83

0.61

134

PSP-26-003

 

83.60

84.10

0.50

2.98

0.35

66

 

 

145.15

145.65

0.50

2.58

0.39

113

 

 

169.35

171.25

1.90

4.93

1.34

133

 

Including

170.20

170.75

0.55

16.15

 

 

 

 

183.00

184.00

1.00

1.20

0.77

144

 

Including

183.00

183.50

0.50

2.27

 

 

 

 

187.50

191.00

3.50

1.12

2.76

148

 

Including

187.50

189.00

1.50

1.17

 

 

 

and

190.00

190.50

0.50

3.45

 

 

 

 

294.10

299.60

5.50

1.03

4.13

235

 

Including

299.10

299.60

0.50

8.10

 

 

 

 

329.00

334.00

5.00

1.10

3.97

262

 

Including

331.25

331.75

0.50

7.78

 

 

 

 

367.00

379.40

12.40

1.46

10.31

295

 

Including

370.50

371.50

1.00

15.40

 

 

 

and

373.60

374.10

0.50

2.02

 

 

 

 

395.80

396.30

0.50

1.18

0.38

313

 

 

411.10

417.70

6.60

1.09

5.07

326

 

Including

412.10

412.60

0.50

1.05

 

 

 

and

412.60

413.10

0.50

1.11

 

 

 

and

413.10

413.60

0.50

6.22

 

 

 

and

413.60

414.20

0.60

1.89

 

 

 

and

415.20

415.70

0.50

1.47

 

 

 

and

415.70

416.20

0.50

1.32

 

 

 

 

419.20

420.30

1.10

1.07

0.60

330

 

Including

419.70

420.30

0.60

1.80

 

 

 

and

430.10

430.60

0.50

2.30

0.09

338

 

 

439.30

442.20

2.90

1.00

2.33

345

 

Including

439.30

440.00

0.70

1.04

 

 

 

and

440.50

441.15

0.65

2.68

 

 

 

and

474.90

475.40

0.50

2.26

0.32

368

 

 

478.50

479.00

0.50

1.53

0.43

370

 

 

505.85

506.35

0.50

1.53

0.41

386

 

 

533.50

534.00

0.50

6.14

0.29

402

PSP-26-004

 

110.40

115.00

4.60

95.93

3.25

71

 

Including

112.30

112.80

0.50

873.00

 

 

 

and

113.80

115.00

1.20

3.77

 

 

PSP-26-005

 

55.05

58.60

3.55

1.08

1.91

42

 

Including

55.05

55.60

0.55

4.67

 

 

 

and

58.10

58.60

0.50

2.33

 

 

 

 

76.85

79.05

2.20

3.11

1.07

59

 

Including

77.35

78.00

0.65

2.77

 

 

 

and

78.00

79.05

1.05

4.58

 

 

 

and

135.35

135.85

0.50

1.05

0.45

101

 

 

194.00

194.50

0.50

1.12

0.32

147

 

 

227.60

228.20

0.60

1.10

0.10

172

 

 

241.50

242.00

0.50

1.24

0.26

182

 

 

294.00

294.50

0.50

2.17

0.45

224

 

 

312.75

313.75

1.00

1.03

0.89

239

 

Including

312.75

313.25

0.50

1.04

 

 

 

and

313.25

313.75

0.50

1.02

 

 

 

 

320.00

321.00

1.00

1.33

0.94

244

 

 

402.40

402.90

0.50

1.17

0.43

306

 

 

412.20

413.30

1.10

1.43

0.72

314

 

Including

412.20

412.80

0.60

1.82

 

 

 

 

414.50

416.45

1.95

1.04

1.05

315

 

Including

415.75

416.45

0.70

2.34

 

 

 

 

522.30

523.20

0.90

1.63

0.52

384

PSP-26-006

 

139.70

140.20

0.50

1.05

0.45

104

 

 

161.00

161.50

0.50

1.16

0.29

121

 

 

251.60

252.10

0.50

20.20

0.35

194

 

 

293.60

294.60

1.00

10.21

0.77

227

 

Including

293.60

294.10

0.50

20.30

 

 

 

 

315.50

316.50

1.00

1.82

0.94

243

 

Including

316.00

316.50

0.50

3.36

 

 

 

and

323.50

324.00

0.50

1.86

0.35

249

 

 

468.50

470.00

1.50

4.86

1.27

361

 

Including

468.50

469.00

0.50

11.50

 

 

 

and

469.50

470.00

0.50

3.06

 

 

 

 

476.50

477.00

0.50

1.33

0.43

366

 

 

499.00

499.50

0.50

1.22

0.43

383

 

 

509.90

510.90

1.00

1.15

0.42

392

 

Including

510.40

510.90

0.50

1.41

 

 

 

 

513.70

514.50

0.80

2.25

0.34

395

PSP-26-007

 

25.80

30.30

4.50

2.30

3.95

17

 

Including

25.80

26.30

0.50

1.73

 

 

 

and

27.30

27.80

0.50

5.62

 

 

 

and

29.30

29.80

0.50

12.25

 

 

 

and

29.80

30.30

0.50

1.09

 

 

 

 

74.05

74.55

0.50

1.05

0.32

44

 

 

80.05

80.55

0.50

1.81

0.43

46

 

 

112.50

113.00

0.50

2.23

0.14

62

 

 

165.35

167.00

1.65

1.35

0.56

90

 

Including

166.00

167.00

1.00

2.00

 

 

 

 

174.90

176.80

1.90

1.19

0.80

95

 

Including

174.90

175.40

0.50

1.98

 

 

 

and

175.40

175.90

0.50

2.37

 

 

 

 

216.35

216.85

0.50

2.35

0.40

116

 

 

266.00

266.85

0.85

1.17

0.43

143

 

 

332.05

338.55

6.50

1.54

3.08

184

 

Including

334.25

335.00

0.75

1.16

 

 

 

and

335.00

335.50

0.50

2.29

 

 

 

and

336.00

336.75

0.75

9.46

 

 

PSP-26-008

 

57.15

57.65

0.50

1.40

0.25

32

 

 

215.50

216.00

0.50

1.11

0.35

122

 

 

222.10

223.25

1.15

1.74

0.94

127

 

Including

222.10

222.75

0.65

2.91

 

 

 

and

226.70

227.20

0.50

3.57

 

 

PSP-26-009

 

172.45

175.45

3.00

1.35

2.16

142

 

Including

172.45

172.95

0.50

7.38

 

 

 

 

381.55

383.20

1.65

2.13

0.92

311

 

Including

381.55

382.20

0.65

1.67

 

 

 

and

382.20

382.70

0.50

4.75

 

 

 

 

388.95

389.50

0.55

15.20

0.35

317

 

 

399.95

400.45

0.50

1.58

0.32

326

 

 

407.65

413.10

5.45

3.17

3.67

334

 

Including

409.40

409.90

0.50

9.52

 

 

 

and

409.90

410.50

0.60

19.30

 

 

 

and

410.50

411.00

0.50

1.22

 

 

 

 

461.55

464.35

2.80

1.72

1.98

377

 

Including

462.45

462.95

0.50

9.06

 

 

PSP-26-012

No Significant Assays

 

 

 

 

PSP-26-011

 

41.50

53.50

12.00

1.30

6.88

27

 

Including

41.50

42.20

0.70

9.92

 

 

 

and

45.50

46.00

0.50

3.75

 

 

 

and

46.50

47.00

0.50

6.19

 

 

 

and

50.75

51.40

0.65

1.50

 

 

 

and

53.00

53.50

0.50

3.63

 

 

 

 

101.50

102.85

1.35

2.30

1.07

57

 

Including

101.50

102.00

0.50

1.65

 

 

 

and

102.00

102.85

0.85

2.69

 

 

 

 

313.80

315.05

1.25

4.18

1.11

180

 

Including

313.80

314.45

0.65

1.44

 

 

 

and

314.45

315.05

0.60

7.14

 

 

 

 

319.00

320.00

1.00

2.35

0.71

183

 

 

325.00

328.00

3.00

1.36

2.30

187

 

Including

325.00

326.00

1.00

1.07

 

 

 

and

327.00

328.00

1.00

2.95

 

 

 

 

382.25

383.00

0.75

1.50

0.57

222

PSP-26-012

No Significant Assays

 

 

 

 

 

11.00

12.50

1.50

1.41

1.15

7

 

Including

11.00

11.50

0.50

3.49

 

 

 

 

207.25

208.25

1.00

2.02

0.79

124

 

Including

207.25

207.75

0.50

3.49

 

 

 

 

234.00

239.50

5.50

1.13

4.21

141

 

Including

234.00

234.50

0.50

1.07

 

 

 

 

238.00

240.50

2.50

1.09

1.77

143

 

Including

238.50

239.00

0.50

2.28

 

 

 

and

239.00

239.50

0.50

2.74

 

 

PSP-26-014

 

97.30

97.85

0.55

1.30

0.48

75

 

 

99.00

103.00

4.00

1.01

3.46

78

 

Including

100.00

100.65

0.65

1.33

 

 

 

and

101.50

103.00

1.50

1.87

 

 

 

 

108.80

111.45

2.65

1.34

1.90

85

 

Including

108.80

109.30

0.50

3.55

 

 

 

and

110.80

111.45

0.65

2.31

 

 

 

 

115.00

116.00

1.00

1.24

0.50

90

 

 

205.00

206.00

1.00

3.39

0.71

162

 

Including

205.00

205.50

0.50

6.51

 

 

 

 

230.50

234.50

4.00

2.79

2.95

184

 

Including

233.10

234.00

0.90

11.55

 

 

 

 

258.65

261.50

2.85

1.20

1.63

205

 

Including

260.00

261.50

1.50

2.16

 

 

 

 

603.00

603.50

0.50

1.74

0.35

415

 

TABLE 2: Surface DD collar locations, orientations, and max depths.

 

Drillhole ID

Easting

(UTM Zn 10N)

Northing

(UTM Zn 10N)

Elevation (m)

Depth (m)

Collar Dip

Collar Azimuth

PSP-26-001

601525

5876998

1719

603.70

-45

125

PSP-26-002

601796

5876670

1755

502.20

-45

125

PSP-26-003

601585

5876904

1721

612.00

-45

125

PSP-26-004

601881

5876622

1750

498.00

-45

125

PSP-26-005

601563

5876859

1721

657.00

-45

125

PSP-26-006

601282

5876968

1675

542.00

-45

125

PSP-26-007

601968

5876571

1737

345.00

-45

125

PSP-26-008

602061

5876515

1717

277.75

-45

125

PSP-26-009

601436

5876996

1699

525.00

-45

125

PSP-26-010

601931

5876700

1735

74.50

-45

125

PSP-26-011

602056

5876519

1718

620.80

-45

125

PSP-26-012

601629

5876769

1728

36.00

-45

125

PSP-26-013

601932

5876700

1735

435.00

-45

125

PSP-26-014

601627

5876769

1728

734.30

-45

125

 

ABOUT THE PROSERPINE PROSPECT

 

The Proserpine Mountain ("Proserpine") prospect area represents a roughly 4 km long post-mineralization fault-bound prospective strike length identified through detailed surface mapping and surface geochemical sampling approximately 7 km along strike to the southeast of the Company’s permitted, 100%-owned Cariboo Gold Project, located in central British Columbia. Mineralization style and controls observed at Proserpine appear to be similar to those observed in the Cariboo Gold deposit area, with high-grade gold intercepts associated with quartz-pyrite to polymetallic (pyrite+/-galena+/-arsenopyrite) quartz veins. Less than half the strike-length of the Proserpine has been drill tested to date, with the current campaign focused on following up on promising preliminary results from the 2019-2020 drilling campaigns at the central southeast limits of the prospect area (Proserpine Southeast). An aggregate total of 10,497 metres of exploration drilling was completed by the Company at the Proserpine regional prospect between 2018 and 2020, not including new drilling contained herein.

 

ABOUT THE CARIBOO GOLD PROJECT

 

The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project located in the historic Wells-Barkerville mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company's land package includes 443 mineral titles and covers an area that extends approximately 77-kilometres from northwest to southeast. In late 2024, the Project was granted the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process for key approvals, solidifying the Project's shovel-ready status.

 

The Cariboo Gold Project hosts probable mineral reserves of 2.071 million ounces of contained Au (17,815 kt grading 3.62 g/t Au); measured mineral resources of 8,000 ounces of contained Au (47 kt grading 5.06 g/t Au); indicated mineral resources of 1.604 million ounces of contained Au (17,332 kt grading 2.88 g/t Au); and inferred mineral resources of 1.864 million ounces of contained Au (18,774 kt grading 3.09 g/t Au). Mineral resources are reported exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The reader is cautioned that inferred mineral resources have a greater degree of uncertainty than indicated mineral resources and must not be converted to mineral reserves; it is reasonably expected, though not guaranteed, that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.

 

Technical Reports

 

Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project is supported by the technical report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" dated June 11, 2025 (with an effective date of April 25, 2025) (the "Cariboo Technical Report").

 

For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein. The Cariboo Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Cariboo Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Gold's issuer profile and on the Company's website at www.osiskogold.ca.

 

Qualified Persons

 

The scientific and technical information contained in this news release has been reviewed, verified and approved by Scott Smith, P. Geo., Vice President, Exploration of Osisko Gold, a "qualified person" within the meaning of NI 43-101. Verification includes core photo and three-dimensional review of logged drillhole data and assays consistent with the Company's standard procedures.

 

The exploration results disclosed in this news release are based on incomplete data and are preliminary in nature. There are no known drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data; however, readers are cautioned that additional drilling and sampling may result in materially different results than those presented herein.

 

Quality Assurance (QA) – Quality Control (QC)

 

HQ and NQ diameter drill core is cut (halved) on site at the Cariboo Project subsequent to QAQC checks for logging and sampling errors. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. Samples are bagged, labelled, sealed with numbered security tags, and transported to the laboratory under secure chain of custody procedures.

 

All drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

 

ABOUT OSISKO GOLD GROUP INC.

 

Osisko Gold Group Inc. is a continental North American gold development company focused on past producing mining camps with district-scale potential. The Company's objective is to become an intermediate gold producer through the development of its flagship, fully permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada. Its project pipeline is complemented by the Tintic Project, located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Gold is focused on developing long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk management, and mineral inventory growth.

 

For further information, visit our website at www.osiskogold.ca or contact:

 

Sean Roosen

Chairman and CEO

Email: sroosen@osiskogold.ca

Tel: +1 (514) 940-0685

 

Philip Rabenok

Vice President, Investor Relations

Email: prabenok@osiskogold.ca

Tel: +1 (437) 423-3644

 

In Europe

Swiss Resource Capital AG

Marc Ollinger

info@resource-capital.ch

www.resource-capital.ch

 

CAUTION REGARDING FORWARD-LOOKING STATEMENTS

 

This news release contains "forward-looking information" (within the meaning of applicable Canadian securities laws) and "forward-looking statements" (within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, as amended) (collectively, "forward-looking statements"). Such forward-looking statements are identified with words such as "may", "will", "would", "could", "anticipate", "believe", "expect", "plan", "intend", "potential", "estimate", "propose", "project", "outlook", "foresee", "objective", "strategy", variants of these words or the negative or comparable terminology, as well as terms usually used in the future and the conditional. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including the assumptions, qualifications, limitations or statements pertaining to: the utility and significance of the exploration drilling at the Proserpine regional target and the results and interpretation thereof; the presence and continuity of an emerging gold mineralized system at Proserpine exhibiting similarities to the Cariboo Gold deposit; the potential for open pit mining methods at Proserpine based on mineralization characteristics observed to date; the significance and interpretation of drill intercepts and the ability to expand the mineralized footprint at Proserpine; the planned resumption and continuation of the drilling program at Proserpine; the prospectivity of exploration in targets outside of currently defined mineral reserves and/or mineral resources; the assumption that a comparison of the strike length and width of the currently defined Cariboo Gold deposit to the area tested to date at the Proserpine exploration target is meaningful and indicative of exploration potential, which has not been demonstrated; the assumption that further exploration at Proserpine will yield results (if any) comparable to those at the Cariboo Gold deposit; the interpretation and accuracy of spatial geometries, geological structure and local variability modeling and assumptions; the results (if any) of further exploration work and ability of the Company to define mineral resources at Proserpine; the ability of exploration work (including drilling and sampling) to accurately predict mineralization; the ability of the Company to complete its exploration objectives in the timing contemplated and within expected costs (if at all); assumptions, qualifications and parameters underlying the Cariboo Technical Report (including, but not limited to, the mineral resources, mineral reserves, production profile, mine design and project economics); the ability of the Company to achieve the estimates outlined in the Cariboo Technical Report in the timing contemplated (if at all); the future development and operations at the Cariboo Gold Project; management's perceptions of historical trends, current conditions and expected future developments; the utility and significance of historic data, including the significance of the district hosting past producing mines; the ability to adapt to changes in gold prices, estimates of costs, estimates of planned exploration and development expenditures; the Company's strategy and objectives relating to the Cariboo Gold Project as well as its other projects; the assumptions, qualifications and limitations relating to the Cariboo Gold Project being permitted; the exploration potential and prospectivity (if any) of its properties; the Company's anticipated name change and trading of its securities under its updated stock ticker symbols (including timing thereof); regulatory framework remaining defined and understood as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein that is not a historical fact may be "forward looking information". Actual results could differ materially due to a number of factors, including, without limitation: the change in the Company's trading symbols and the marketplace effective date of such changes, risks relating to third-party approvals, including the issuance of permits by governments, capital market conditions and the Company's ability to access capital on terms acceptable to the Company for the contemplated exploration and development at the Company's properties; risks related to the exploration, development and operation of the Cariboo Gold Project; risks related to geological modeling and resource estimation; health, safety and security incidents; regulatory delays or changes in regulatory framework and applicable laws; labour shortages or disputes; general economic and market conditions and business conditions in the mining industry; fluctuations in commodity and currency exchange rates; changes in regulatory framework and applicable laws, as well as those risks and factors disclosed in the Company's most recent annual information form, financial statements and management's discussion and analysis as well as other public filings on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov).

 

Although the Company believes the expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.