September 8, 2026 - Rua Gold Inc. (TSX: RUA, NZX: RGI, OTC: NZAUF, WKN: A40QYC) (“RUA GOLD" or the "Company") is pleased to provide an update on its Auld Creek gold-antimony project (the “Auld Creek Project”) in Reefton, New Zealand.

 

RUA GOLD’s exploration team has completed 19,600m of drilling, primarily focused on improving the confidence of Mineral Resource and provide detailed data for the geotechnical, hydrological and metallurgical studies supporting the pre-feasibility study (“PFS”) required for the Company’s Fast-Track Approvals Mining Application. Following the July 2026 announcement[1] that the Auld Creek Project had been accepted as a listed project under New Zealand’s Fast-Track Approvals regime, the Company remains on track to execute on its strategy and submit its substantive application in October 2026 and publish the PFS in December 2026. [2]

 

Highlights:

 

  • Four drill rigs continue testing the growing resource, which remains open in all directions.
  • RUA GOLD’s exploration team has completed 19,600m of resource drilling, exceeding its 19,000m target.
  • Highlighted assay results from drilling at Auld Creek include:
    • ACDDH086: 2.7m @ 23.2 g/t AuEq2 (15.4 g/t Au & 3.6% Sb) from 249m
    • ACDDH103: 7.0m @ 9.9 g/t AuEq2 (5.7 g/t Au & 2.0% Sb) from 133m
    • ACDDH104: 32.0m @ 2.4 g/t AuEq2 (2.1 g/t Au & 0.1% Sb) from 332m
    • ACDDH106: 11.3m @ 5.7 g/t Au (incl 0.8m @ 17.65g/t Au) from 159m
    • ACDDH107: 1.9m @ 22.7 g/t AuEq2 (10.1 g/t Au & 5.8% Sb) from 249.55m
    • ACDDH108: 11.3m @ 6.11 g/t Au from 256m
    • ACDDH111: 4.5m @ 12.6 g/t AuEq2 (5.8 g/t Au & 3.1% Sb) from 138m
    • ACDDH112: 2.9m @ 38.8 g/t AuEq2 (9.3 g/t Au & 13.7% Sb) from 226m
    • ACDDH119: 0.6m @ 136.2 g/t AuEq2 (82.9 g/t Au & 24.8% Sb) from 237.6m
  • Ultra-detailed geological and structural studies have significantly improved the Company’s understanding of the orientation of high-grade mineralized shoots, contributing to a high drill-targeting success rate and improved intercept grades.
  • Localised mineralized zones exceeding 20m in width support the potential scale and continuity of the resource. Drilling has also returned exceptionally high individual grades and the first observations of visible gold at the Auld Creek Project.
  • Assay results from a further 18 drill holes are pending and will contribute to the updated Mineral Resource estimate anticipated in Q4 2026.
  • The Company remains on track to submit its substantive application under New Zealand’s Fast -Track Approvals regime in October 2026.

 

Robert Eckford, Chief Executive Officer of RUA GOLD, commented: “These exceptional exploration results are informing the mine plan and reinforcing the significant development potential of the Auld Creek Project. The deposit continues to exceed our expectations and remains open in all directions. Our improved understanding of the orientation of the high-grade mineralized shoots will be crucial as we advance the next phase of illing. The occurrence of visible gold is particularly encouraging and suggests that grades may improve with depth.”

 

Figure 1: Highlights from recent Auld Creek drilling

 

Table 1: Significant intercepts from recent Auld Creek drilling.

 

Hole ID

From

To

Interval

Au (g/t)

Sb

Including

ACDDH086

249.2

251.95

2.75

15.4

3.60%

 

ACDDH103

133

140

7

5.66

1.96%

0.85m @ 15g/t Au

ACDDH104

332.1

364.1

32

2.11

 

1.1m @ 1.8% Sb and 1m @ 1.08% Sb (20m apart)

ACDDH106

158.6

169.9

11.3

5.67

 

0.8m @ 17.65g/t Au

ACDDH107

249.55

250.7

1.9

10.1

5.88%

 

ACDDH108

256

267.3

11.3

6.11

 

1m @ 21.8g/t Au

ACDDH111

138

142.5

4.5

5.84

3.14%

2m @ 9.87g/t Au and 2.5m @ 5.45% Sb

ACDDH112

226

228.85

2.85

9.29

13.71%

0.5m @ 40.5g/t Au

ACDDH119

237.6

238.15

0.6

82.9

24.80%

 

 

AULD CREEK EXPLORATION UPDATE

 

Recent drilling continues to demonstrate the potential to expand the Auld Creek gold-antimony resource, which extends over 1,000m in length and to a depth of more than over 500m.  Following completion of the planned 19,600m drill program, and encouraged by the exceptional results received to date, the Company will continue drilling with four rigs during the fourth quarter of 2026 to test the deposit along strike and at depth.

 

Drill targeting was guided by detailed structural mapping used to interpret the orientation and plunge of the prospective high-grade mineralized shoots. Stereonet plotting of the dips and strikes within the main Fraternal Fault zone indicates an overall orientation of 186°/84°W. The analysis also indicates that the shears and breccias intersecting the Fraternal Fault are orientated at 354° with a moderate plunge.

 

Drilling based on these structural guides have demonstrated strong continuity of mineralization along the interpreted orientations and a high success rate in testing planned targets.

 

Figure 2: Shoot orientations on Fraternal, Auld Creek

 

Two features of the recent drilling program are particularly notable:

 

  1. Certain mineralized shoots demonstrate increasing gold and antimony grades, including intervals where visible gold has been observed (Zone 1- Figure 2).
  2. Mineralized widths increase in certain areas, with discrete hanging wall and footwall zones of higher antimony mineralization enveloping a broad zone grading of approximately 2-3 g/t Au (Zone 2 - Figure 2).

 

Figure 3: High grade Au and Sb from Zone 1, Figure 2.

 

The resource drilling program also incorporates the geotechnical, hydrological and metallurgical studies required for the PFS, including rock strength testing, specific gravity and ore zone characterization. This work is substantially complete and will support the Company’s forthcoming Fast -Track Approvals application and the filing of the required NI 43-101 technical reports.

 

Figure 4: Location of active Rua Gold exploration projects

 

MANAGEMENT UPDATE

 

RUA GOLD is also pleased to announce the appointment of Darren Prins as Interim Chief Financial Officer and Corporate Secretary during the planned maternity leave of Zeenat Lokhandwala.

 

Mr. Prins brings extensive experience in corporate reporting, governance and mergers and acquisitions. Throughout his career, he has held senior financial leadership positions with several publicly listed mining companies, including Timmins Gold, Mayfair Gold and First Mining Gold.

 

ABOUT RUA GOLD

 

RUA GOLD is an exploration company, strategically focused on New Zealand. With decades of expertise, our team has successfully turned major discoveries into producing world-class mines in multiple continents. The team is now focused on maximizing the asset potential of RUA GOLD’s two highly prospective high-grade gold projects.

 

The Company controls the Reefton Gold District as the dominant landholder in the Reefton Goldfield on New Zealand’s South Island with over 120,000 hectares of permits, in a district that historically produced over 2Moz of gold grading from 9–50g/t[3].

 

The Company’s Glamorgan Project solidifies RUA GOLD’s position as a leading high-grade gold explorer on New Zealand’s North Island. This highly prospective project is located within the North Islands’ Hauraki District, a region that has produced an impressive 15Moz of gold and 60Moz of silver[4].

 

For further information, please refer to the Company’s disclosure record on SEDAR+ at www.sedarplus.ca.

 

TECHNICAL INFORMATION

 

Simon Henderson CP, AUSIMM, a qualified person under National Instrument 43-101 Standards of Disclosure for Mineral Projects and Chief Operating Officer and a director of RUA GOLD, has reviewed and approved the technical disclosure contained herein. Mr. Henderson has participated in the geochemical sampling, and mapping programs to verify that they have been conducted in accordance with standard operating procedures. Mr. Henderson has verified the data disclosed by running checks on the location, analytical, and test data underlying the information in the technical disclosure herein.

 

QA/QC Drill Core

 

Core samples were sent to SGS Laboratories, Westport for sample preparation. SGS is independent of the Company.  Samples were crushed and pulverized to 85% passing 75 µm. The pulverized rock-chips were split into two samples: ~50 g for laboratory analysis, and the reject returned to Rua for pXRF analysis and storage.

 

Pulverized rock-chip samples were sent to ALS Brisbane to be analyzed for gold (Au) by 50-g fire assay with AAS finish (ALS Code Au-AA26); and for antimony (Sb) with lithium borate fusion sample preparation followed by an X-ray Fluorescence (XRF) instrument finish (ALS Codes: Sb-XRF15b for 0.005-20.0% Sb and Sb-XRF15c for 0.01-80.0% Sb).

 

RUA GOLD Contact

 

New Zealand

Simon Delander

VP Risk Stakeholder Regulatory Affairs

Email: sdelander@RUAGOLD.com

Website: www.RUAGOLD.com

 

Canada

Robert Eckford

Chief Executive Officer

Email: reckford@RUAGOLD.com

 

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this new release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur and specifically include statements regarding: the Company’s strategies, expectations, planned operations or future actions, including but not limited to drill program at the Auld Creek target and the timing and results thereof, the timing or results of PFS, the timing or result of an application for a mine permit, and the expected contributions of Mr. Prins. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements.

 

Investors are cautioned that any such forward-looking statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. A variety of inherent risks, uncertainties and factors, many of which are beyond the Company’s control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include: general business, economic, competitive, political and social uncertainties; risks related to the effects of the Russia-Ukraine war; risks related to climate change; operational risks in exploration, delays or changes in plans with respect to exploration projects or capital expenditures; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; changes in labour costs and other costs and expenses or equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, including but not limited to environmental hazards, flooding or unfavorable operating conditions and losses, insurrection or war, delays in obtaining governmental approvals or financing, and commodity prices. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and reference should also be made to the Company's short form base shelf prospectus dated July 11, 2024, and the documents incorporated by reference therein, filed under its SEDAR+ profile at www.sedarplus.ca for a description of additional risk factors.

 

Forward-looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

 

Table 2: Location of Auld Creek reported drill holes from RUA program

 

Hole ID

Easting

Northing

rL

Total Depth

Site _ID

Dip

Azimuth (true)

Year

ACDDH079

1507082.2

5333093.18

583.32

316.8

Pad 08

-60

120

2026

ACDDH080

1507191.04

5333295.02

514.48

253.3

Pad 04

-76

140

2026

ACDDH081

1507072.37

5332958.36

605.52

432.2

Pad 18

-73

85

2026

ACDDH082

1507082.56

5333095.59

582.4

343.9

Pad 08

-66.5

84

2026

ACDDH085

1507072.65

5332958.23

605.5

397

Pad 18

-71.5

104

2026

ACDDH086

1507119.66

5333160.15

539.6

279.9

Pad 09

-69

82

2026

ACDDH088

1507082.87

5333092.69

583.13

273.8

Pad 08

-53.5

123

2026

ACDDH089

1507071.17

5332957.77

605.63

439.3

Pad 18

-74

119

2026

ACDDH090A

1507119.2

5333160.24

539.51

375.7

Pad 09

-75

82

2026

ACDDH091

1507082.86

5333094.38

582.98

296.6

Pad 08

-61.5

105.7

2026

ACDDH093

1507071.65

5332958.1

605.68

516.4

Pad 18

-78.3

100.4

2026

ACDDH094

1507192.48

5333294.7

514.76

271.3

Pad 04

-74.5

117.4

2026

ACDDH095

1507082.47

5333092.53

583.36

296

Pad 08

-58

127

2026

ACDDH096

1507192.5

5333294.7

514.77

184.5

Pad 04

-71.3

115

2026

ACDDH097

1507083.42

5333093.45

582.96

263

Pad 08

-55.2

109.5

2026

ACDDH098

1507072.71

5332958.15

605.56

278

Pad 18

-60

90

2026

ACDDH099

1507193

5333296.48

514.38

133.9

Pad 04

-69.5

101

2026

ACDDH100

1507289.57

5333151.2

537.64

178.7

Pad 24

-61.6

247

2026

ACDDH101

1507191.97

5333295.33

514.58

212.5

Pad 04

-62.5

37.6

2026

ACDDH102

1507072.5

5332957.9

605.57

348.8

Pad 18

-66.3

86.7

2026

ACDDH103

1507191.91

5333294.49

514.76

183.7

Pad 04

-63.5

43.5

2026

ACDDH104

1507082.42

5333092.9

583.24

381.8

Pad 08

-67.7

124.3

2026

ACDDH105

1507289.64

5333152.93

537.48

241

Pad 24

-63

295

2026

ACDDH106

1507192

5333293.02

514.93

216.8

Pad 04

-72.4

55.8

2026

ACDDH107

1507074.2

5332955.3

606

258.8

Pad 18

-55.9

99

2026

ACDDH108

1507290.3

5333152.93

537.57

283.8

Pad 24

-73.3

302.4

2026

ACDDH110

1507192.46

5333293.29

514.74

164.9

Pad 04

-67.6

63.6

2026

ACDDH111

1507192.15

5333295.22

514.49

177.5

Pad 04

-69.4

57.5

2026

ACDDH112

1507072.67

5332957.8

605.52

260.8

Pad 18

-56.2

105.7

2026

ACDDH113

1507082.66

5333093.28

583.23

343.2

Pad 08

-64.3

109.8

2026

ACDDH114

1507191.12

5333295.03

514.35

148.3

Pad 04

-68

127.2

2026

ACDDH115

1507290.72

5333152.76

537.73

312.6

Pad 24

-71

315.5

2026

ACDDH116

1507072.69

5332957.25

605.64

271.5

Pad 18

-58.3

82.3

2026

ACDDH117

1507191.71

5333292.6

515.12

179.5

Pad 04

-52

161.6

2026

ACDDH119

1507074.2

5332955.6

605.10

248.1

Pad 18

-55.7

95.7

2026

 

Table 3: Significant drilling intercepts at Auld Creek, full mineralized zone composites

 

Hole_ID

From

To

Interval

Au (g/t)

Sb (%)

ACDDH082

316.6

316.9

0.3

5.45

0.01

ACDDH085

355

356

1

2.04

0.01

ACDDH085

356

357

1

0.81

0.01

ACDDH085

357

358

1

0.44

0.01

ACDDH085

358

358.5

0.5

0.84

-0.01

ACDDH085

358.5

358.8

0.3

0.62

0.01

ACDDH085

358.8

359.3

0.5

0.64

-0.01

ACDDH085

359.3

359.8

0.5

4.22

0.01

ACDDH085

359.8

360.3

0.5

8.04

0.02

ACDDH085

360.3

360.85

0.55

15.6

0.10

ACDDH085

360.85

361.4

0.55

3.16

0.01

ACDDH086

249.2

249.6

0.4

10.3

0.02

ACDDH086

249.6

250

0.4

23.2

0.02

ACDDH086

250

250.7

0.7

23

2.41

ACDDH086

250.7

251.3

0.6

8.23

8.39

ACDDH086

251.3

251.95

0.65

12.2

4.90

ACDDH086

265.8

266.6

0.8

1.92

0.01

ACDDH086

266.6

267.3

0.7

2.01

0.01

ACDDH086

267.3

267.9

0.6

3.33

0.01

ACDDH095

278.3

279.1

0.8

0.3

1.08

ACDDH095

279.1

279.8

0.7

0.67

1.84

ACDDH095

279.8

280.5

0.7

1.3

0.18

ACDDH095

280.5

281.3

0.8

0.05

0.09

ACDDH095

281.3

282.35

1.05

4.74

1.41

ACDDH097

254.9

255.35

0.45

1.58

0.02

ACDDH097

255.35

255.8

0.45

1.03

0.01

ACDDH097

255.8

256.1

0.3

2.45

0.06

ACDDH097

256.1

256.4

0.3

3.7

0.97

ACDDH097

256.4

256.8

0.4

0.47

0.38

ACDDH097

256.8

257.2

0.4

0.76

0.67

ACDDH098

259.8

260.35

0.55

5.92

2.43

ACDDH099

112

112.5

0.5

1.46

0.01

ACDDH099

112.5

113

0.5

1.15

0.06

ACDDH099

113

113.4

0.4

5.51

4.36

ACDDH099

113.4

113.85

0.45

3.48

4.42

ACDDH099

113.85

114.15

0.3

0.57

0.33

ACDDH099

114.15

114.55

0.4

0.41

0.05

ACDDH102

296

296.55

0.55

3.22

1.77

ACDDH102

301.5

302

0.5

2.75

0.19

ACDDH102

302

302.5

0.5

4.89

0.50

ACDDH102

302.5

303

0.5

3.51

0.25

ACDDH102

303

303.6

0.6

4.11

0.03

ACDDH102

303.6

304

0.4

0.05

0.01

ACDDH102

304

304.5

0.5

0.02

-0.01

ACDDH102

304.5

305

0.5

0.27

0.01

ACDDH102

305

305.5

0.5

0.28

-0.01

ACDDH102

305.5

305.8

0.3

1.24

1.31

ACDDH102

305.8

306.1

0.3

0.68

-0.01

ACDDH102

306.1

306.5

0.4

0.51

-0.01

ACDDH102

306.5

307

0.5

0.43

-0.01

ACDDH102

307

307.5

0.5

0.52

-0.01

ACDDH102

307.5

308

0.5

1.14

-0.01

ACDDH103

133

133.5

0.5

1

0.02

ACDDH103

133.5

134

0.5

4.62

3.50

ACDDH103

134

134.7

0.7

4.59

9.52

ACDDH103

134.7

135.3

0.6

1.98

0.01

ACDDH103

135.3

136

0.7

5.76

0.07

ACDDH103

136

136.4

0.4

4.17

0.04

ACDDH103

136.4

136.75

0.35

5.98

-0.01

ACDDH103

136.75

137.1

0.35

4.75

0.32

ACDDH103

137.1

137.75

0.65

6.42

0.83

ACDDH103

137.75

138.3

0.55

4.95

0.09

ACDDH103

138.3

138.75

0.45

6

5.08

ACDDH103

138.75

139.1

0.35

11.25

6.27

ACDDH103

139.1

139.6

0.5

17.8

0.16

ACDDH103

139.6

140

0.4

1.39

0.02

ACDDH103

150

150.5

0.5

1.99

0.009

ACDDH103

150.5

151

0.5

0.81

0.007

ACDDH103

151

151.5

0.5

1.05

-0.005

ACDDH103

151.5

152

0.5

1.52

0.009

ACDDH103

152

152.5

0.5

0.46

-0.005

ACDDH103

152.5

153

0.5

1.84

-0.005

ACDDH103

153

153.5

0.5

2.29

-0.005

ACDDH103

153.5

154

0.5

3.44

-0.005

ACDDH104

331.1

332.1

1

0.61

0.03

ACDDH104

332.1

333.2

1.1

2.17

1.82

ACDDH104

333.2

333.9

0.7

5.79

0.09

ACDDH104

333.9

334.8

0.9

2.93

0.02

ACDDH104

334.8

335.7

0.9

1.92

-0.01

ACDDH104

335.7

336.5

0.8

1.56

0.01

ACDDH104

336.5

337.5

1

3.36

0.01

ACDDH104

337.5

338.5

1

2.21

-0.01

ACDDH104

338.5

339

0.5

3.78

-0.01

ACDDH104

339

340

1

2.74

0.01

ACDDH104

340

341

1

2.97

-0.01

ACDDH104

341

342

1

1.6

0.01

ACDDH104

342

342.5

0.5

0.87

-0.01

ACDDH104

342.5

343.2

0.7

4.5

0.06

ACDDH104

343.2

344

0.8

1.73

0.01

ACDDH104

344

344.8

0.8

0.61

0.01

ACDDH104

344.8

345.5

0.7

2.25

-0.01

ACDDH104

345.5

346.3

0.8

0.48

0.01

ACDDH104

346.3

347.1

0.8

0.99

0.01

ACDDH104

347.1

347.9

0.8

0.94

0.01

ACDDH104

347.9

348.6

0.7

3.4

0.02

ACDDH104

348.6

349.6

1

1.88

0.01

ACDDH104

349.6

350.6

1

0.93

-0.01

ACDDH104

350.6

351.7

1.1

0.73

0.01

ACDDH104

351.7

352.3

0.6

2.16

0.01

ACDDH104

352.3

353.4

1.1

0.96

0.01

ACDDH104

353.4

354.4

1

1.89

1.08

ACDDH104

354.4

355.4

1

3.91

0.28

ACDDH104

355.4

356.4

1

2.94

0.06

ACDDH104

356.4

357.2

0.8

1.45

0.15

ACDDH104

357.2

358.2

1

2.44

0.02

ACDDH104

358.2

359.1

0.9

2.03

0.02

ACDDH104

359.1

360.3

1.2

1.61

0.01

ACDDH104

360.3

361.3

1

1.05

0.01

ACDDH104

361.3

362.3

1

1.8

0.01

ACDDH104

362.3

363.3

1

2.4

0.01

ACDDH104

363.3

364.1

0.8

2.59

0.01

ACDDH104

364.1

365

0.9

0.3

-0.01

ACDDH104

365

366

1

0.51

0.01

ACDDH104

366

367.1

1.1

0.68

-0.01

ACDDH104

367.1

368.2

1.1

0.17

-0.01

ACDDH104

368.2

369.5

1.3

0.41

-0.01

ACDDH104

369.5

370.8

1.3

0.01

-0.01

ACDDH104

370.8

372

1.2

1.2

0.01

ACDDH104

372

373.2

1.2

0.36

-0.01

ACDDH104

373.2

374

0.8

0.26

0.01

ACDDH104

374

374.8

0.8

0.48

0.01

ACDDH104

374.8

376

1.2

1

0.01

ACDDH104

376

377

1

0.45

0.01

ACDDH105

202.8

203.6

0.8

2

-0.01

ACDDH105

203.6

204.4

0.8

3.01

-0.01

ACDDH105

204.4

205.3

0.9

4.8

-0.01

ACDDH106

158.6

159.6

1

6.67

-0.01

ACDDH106

159.6

160.6

1

0.47

-0.01

ACDDH106

160.6

161.4

0.8

1.12

-0.01

ACDDH106

161.4

162

0.6

8.16

-0.01

ACDDH106

162

163

1

4.2

-0.01

ACDDH106

163

164

1

8.87

0.01

ACDDH106

164

165

1

3.92

-0.01

ACDDH106

165

165.8

0.8

4.27

-0.01

ACDDH106

165.8

166.6

0.8

2.58

-0.01

ACDDH106

166.6

167.4

0.8

17.65

0.01

ACDDH106

167.4

168.1

0.7

7.52

-0.01

ACDDH106

168.1

169.1

1

7.92

0.01

ACDDH106

169.1

169.9

0.8

1.71

0.01

ACDDH107

249.55

249.85

0.3

5.6

5.93

ACDDH107

249.85

250.35

0.5

4.24

2.16

ACDDH107

250.35

250.7

0.35

11.95

13.95

ACDDH107

250.7

251

0.3

19.6

8.22

ACDDH107

251

251.45

0.45

11.85

2.15

ACDDH108

256

257

1

21.8

0.01

ACDDH108

257

258

1

6.82

-0.01

ACDDH108

258

259

1

12.35

0.01

ACDDH108

259

259.8

0.8

0.95

-0.01

ACDDH108

259.8

260.7

0.9

5.32

0.01

ACDDH108

260.7

261.6

0.9

7.51

-0.01

ACDDH108

261.6

262.5

0.9

9.94

-0.01

ACDDH108

262.5

263.3

0.8

0.28

-0.01

ACDDH108

263.3

264.1

0.8

0.15

-0.01

ACDDH108

264.1

264.9

0.8

0.61

-0.01

ACDDH108

264.9

265.7

0.8

4.75

0.01

ACDDH108

265.7

266.5

0.8

0.83

0.01

ACDDH108

266.5

267.3

0.8

1.92

0.01

ACDDH110

115.75

116.4

0.65

1.08

2.47

ACDDH110

116.4

117

0.6

3.78

2.61

ACDDH111

138

138.5

0.5

2.14

0.03

ACDDH111

138.5

139

0.5

3.08

0.76

ACDDH111

139

139.5

0.5

0.45

5.49

ACDDH111

139.5

140

0.5

3.65

3.59

ACDDH111

140

140.5

0.5

5.49

0.19

ACDDH111

140.5

140.85

0.35

14.05

5.64

ACDDH111

140.85

141.2

0.35

8.75

17.85

ACDDH111

141.2

141.5

0.3

18.5

2.64

ACDDH111

141.5

142

0.5

6.93

0.06

ACDDH111

142

142.5

0.5

3.8

0.12

ACDDH112

226

226.3

0.3

1.85

3.61

ACDDH112

226.3

226.6

0.3

3.52

17.20

ACDDH112

226.6

226.95

0.35

2.75

17.00

ACDDH112

226.95

227.45

0.5

40.5

8.34

ACDDH112

227.45

228

0.55

1.23

8.98

ACDDH112

228

228.5

0.5

4.84

23.10

ACDDH112

228.5

228.85

0.35

1.6

17.80

ACDDH112

239.45

240

0.55

2.77

1.36

ACDDH112

240

240.55

0.55

4.85

2.15

ACDDH112

243.6

244.2

0.6

9.08

4.02

ACDDH113

323.95

324.45

0.5

5.43

0.06

ACDDH113

324.45

324.9

0.45

7.8

0.03

ACDDH114

108.3

108.8

0.5

11.6

5.26

ACDDH114

108.8

109.9

1.1

6.63

4.96

ACDDH115

256

257

1

0.47

-0.01

ACDDH115

257

258

1

3

-0.01

ACDDH115

258

259

1

0.48

-0.01

ACDDH115

259

260

1

2.04

-0.01

ACDDH115

260

261

1

0.79

-0.01

ACDDH115

261

262

1

0.66

-0.01

ACDDH115

262

263

1

1

0.01

ACDDH115

263

264

1

4.05

0.01

ACDDH115

264

265

1

0.63

-0.01

ACDDH115

265

266

1

0.84

-0.01

ACDDH115

266

267

1

0.73

-0.01

ACDDH115

267

268

1

0.05

-0.01

ACDDH115

268

269

1

1.27

-0.01

ACDDH116

254.05

254.65

0.6

1.21

1.09

ACDDH116

254.65

255.35

0.7

0.2

0.03

ACDDH116

255.35

255.65

0.3

2.35

22.00

ACDDH117

148.35

148.95

0.6

1.74

-0.01

ACDDH117

148.95

149.55

0.6

1.21

-0.01

ACDDH117

149.55

150.15

0.6

1.39

-0.01

ACDDH117

150.15

151

0.85

2.6

-0.01

ACDDH117

151

151.5

0.5

4.32

-0.01

ACDDH117

151.5

152

0.5

1.97

-0.01

ACDDH117

157.4

158

0.6

1.14

0.07

ACDDH117

158

158.6

0.6

0.59

0.03

ACDDH117

158.6

159.2

0.6

1.86

0.01

ACDDH117

159.8

160.4

0.6

1.66

0.02

ACDDH117

160.4

161.2

0.8

0.65

0.02

ACDDH117

161.2

161.85

0.65

2.48

0.12

ACDDH117

161.85

162.4

0.55

9.71

0.15

ACDDH117

162.4

162.6

0.2

2.52

0.06

ACDDH117

162.6

163.15

0.55

1

0.01

ACDDH119

237.6

238.15

0.55

82.9

24.80

 


[1] See Rua Gold news release “RUA GOLD’s Auld Creek Project Qualifies for New Zealand’s 6-Month Fast-Track Approvals Process” dated July 30, 2026, available on the Company’s website at www.ruagold.com and on SEDAR+ at www.sedarplus.ca

[2]Based on the recent Reefton Technical Report, the gold equivalent formula is based on AuEq = Au g/t + 2.15 x Sb% using a Au price of US$3,000/oz, Sb price of US$25,000 per tonne and 85% recovery.

[3] Technical Report on the Reefton Project, New Zealand, with an effective date of February 27, 2026 available under the Company's SEDAR+ profile at www.sedarplus.ca.

[4] Christie, A., Simpson, M., Barker, R., and Braithwaite, R. 2019. Exploration for epithermal Au-Ag deposits in New Zealand: history and strategy. New Zealand Journal of Geology and Geophysics, 62:1, 414-441. NI 43-101 Technical Report, Waihi District Pre-feasibility Study, New Zealand. OceanaGold Corporation, Report Date: December 11, 2024.