KEY SUMMARY Maiden diamond drilling campaign at Erak Prospect (Sinjakovo Project) delivers further gold intercepts: – 36.1m @ 2.3 g/t Au in ERDD006 from 51.8m o Including 3m @ 14.5 g/t Au from 51.8m (incl. 1m @ 42.5 g/t Au)o and 1.9m @ 16.0 g/t Au from 86m (incl 0.9m @ 26.6 g/t Au)- 10.4m @ 2.6g/t Au in ERDD009 from
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed