October 5, 2026 - Rua Gold Inc. (TSX: RUA, NZX: RGI, OTC: NZAUF, WKN: A40QYC) (“RUA GOLD" or the "Company") is pleased to provide an update on exploration and resource drilling at its Auld Creek gold-antimony project (the “Auld Creek Project”) in Reefton, New Zealand.

 

Ongoing resource drilling at Auld Creek continues to demonstrate strong continuity of the high-grade mineralized shoots, with mineralization remaining open along strike and at depth. Following the Company’s July 2026 announcement[i] that Auld Creek had been accepted as a listed project under New Zealand’s Fast-Track Approvals regime, RUA GOLD remains on track to submit its substantive application in October 2026 and publish a Pre-Feasibility Study (“PFS”) in December 2026. [ii]

 

Highlights:

 

  • Four drill rigs continue to advance resource drilling across the growing Auld Creek system, which remains open along strike and at depth.
  • Recent drilling continues to intersect high-grade gold-antimony mineralization, including narrow zones of exceptional gold grades in ACDDH127 and ACDDH130 of 0.3m at 43.6 g/t Au (>1 oz/t Au) and 0.3m at 69.2 g/t Au (>2 oz/t Au), respectively. Visible gold continues to be observed in drill core.
  • Highlighted assay results from drilling at Auld Creek include:
    • ACDDH121: 11.7m @ 5.0 g/t AuEq2 (4.1 g/t Au & 0.4% Sb) from 365m
    • ACDDH123A: 2.2m @ 34.6 g/t AuEq2 (10.3 g/t Au & 11.3% Sb) from 228m
    • ACDDH123B: 5m @ 7.4 g/t AuEq2 (4.8 g/t Au & 1.2% Sb) from 236m
    • ACDDH127: 6.6m @ 24.9 g/t AuEq2 (10.5 g/t Au & 6.7% Sb) from 359m
      • Incl 0.3m @ 43.6 g/t Au and 33.3% Sb
    • ACDDH130: 6.3m @ 14.4 g/t AuEq2 (13.7 g/t Au & 0.3% Sb) from 208m
      • Incl 0.3m @ 69.2 g/t Au
  • Drilling continues to demonstrate continuity of the shallow-dipping mineralized shoots along strike. Repeating shoots at depth, occurring at approximately 40m intervals, support the potential for further resource growth to the north and at depth.
  • Four drill rigs remain focused on resource development ahead of an updated Mineral Resource Estimate targeted for Q4 2026.
  • The Company remains on track to submit its substantive application under New Zealand’s Fast-Track Approvals regime in October 2026.

 

The Company’s CEO Robert Eckford commented “These latest results, together with continued observations of visible gold, reinforce the high-grade nature and growth potential of Auld Creek. The continuity of the high-grade shoots, together with repeating mineralization at depth, is increasing our confidence in the potential for further resource growth.

 

With four rigs continuing to advance the resource, we are targeting an updated Mineral Resource Estimate in Q4 while remaining on track to submit our Fast-Track Approvals application in October.”

 

P10#yIS1

Figure 1: Highlights from recent Auld Creek drilling -Long section Fraternal Structure

 

AULD CREEK EXPLORATION UPDATE

 

Drilling continues to demonstrate strong evidence to expand the gold-antimony resource; the Fraternal structure (a major synclinal sheared fold structure) that hosts the mineralization has been drill confirmed to extend northward for over 1,400 meters and intercepted at over 500 meters depth.

 

Infill drilling along the Fraternal structure is confirming high-grade mineralized shoots dipping shallow- moderately northward in a repetitive sequence at depth of 40-60m. The current ratio of conversion of inferred to indicated resources is greater than 70% and improving with every successful drill hole.

 

Currently drilling is probing northward to extend the length of the mineralized body, with the depth potential to be examined in Q4 2026.

 

The active resource drill out program includes the full range of geotechnical and metallurgical testing required for PFS, including hydrology, rock strength, specific gravity and ore zone characterization. This work is largely complete for the up-and-coming Fast -Track application and lodgment of required NI 43 101 reports.

 

P19#yIS1

Figure 2: High grade Au and Sb from ACDDH127 and ACDDH130.

 

Table 1: Significant intercepts from recent Auld Creek drilling.

 

Hole ID

From (m)

To (m)

Interval (m)

True Width (m)

Au (g/t)

Sb %

Including

ACDDH121

365.5

377.2

11.7

4.9

4.1

0.4%

5m @ 6.5g/t Au & 2m @ 1.7% Sb

ACDDH123A

228

230.2

2.2

0.6

10.3

11.3%

 

ACDDH123B

236

241

5

1.3

4.8

1.2%

 

ACDDH124

209.1

219.5

10.4

9.3

1.3

0.4%

0.4m @ 5.2g/t Au & 3.4% Sb

ACDDH126

228

235

7

1.8

2.1

0.1%

 

ACDDH127

359

365.6

6.6

3.6

10.5

6.7%

0.3m @ 43.6g/t Au & 33.3% Sb

ACDDH130

208.3

214.6

6.3

2.5

13.7

0.3%

0.3m @ 33.0g/t Au & 6.8% Sb followed by 0.3m @ 69.2g/t Au

 

P89#yIS1

Figure 3: Location of active Rua Gold exploration projects

 

ABOUT RUA GOLD

 

RUA GOLD is an exploration company, strategically focused on New Zealand. With decades of expertise, our team has successfully turned major discoveries into long standing producing mines in multiple continents. The team is now focused on maximizing the asset potential of RUA GOLD’s two highly prospective high-grade gold projects.

 

The Company controls the Reefton Gold District as the dominant landholder in the Reefton Goldfield on New Zealand’s South Island with over 120,000 hectares of permits, in a district that historically produced over 2Moz of gold grading from 9–50g/t[iii].

 

The Company’s Glamorgan Project solidifies RUA GOLD’s position as a leading high-grade gold explorer on New Zealand’s North Island. This highly prospective project is located within the North Islands’ Hauraki District, a region that has produced an impressive 15Moz of gold and 60Moz of silver[iv].

 

For further information, please refer to the Company’s disclosure record on SEDAR+ at www.sedarplus.ca.

 

TECHNICAL INFORMATION

 

Simon Henderson CP, AUSIMM, a qualified person under National Instrument 43-101 Standards of Disclosure for Mineral Projects and Chief Operating Officer and a director of RUA GOLD, has reviewed and approved the technical disclosure contained herein. Mr. Henderson has participated in the geochemical sampling, and mapping programs to verify that they have been conducted in accordance with standard operating procedures. Mr. Henderson has verified the data disclosed by running checks on the location, analytical, and test data underlying the information in the technical disclosure herein.

 

QA/QC Drill Core

 

Core samples were sent to SGS Laboratories, Westport for sample preparation. SGS is independent of the Company. Samples were crushed and pulverized to 85% passing 75 µm. The pulverized rock-chips were split into two samples: ~50 g for laboratory analysis, and the reject returned to Rua for pXRF analysis and storage. Control samples (certified standards and uncertified blanks), along duplicates, are inserted at a target 12% insertion rate. Results are assessed for accuracy, precision, and contamination on an ongoing basis.

 

Pulverized rock-chip samples were sent to ALS Brisbane to be analyzed for gold (Au) by 50-g fire assay with AAS finish (ALS Code Au-AA26); and for antimony (Sb) with lithium borate fusion sample preparation followed by an X-ray Fluorescence (XRF) instrument finish (ALS Codes: Sb-XRF15b for 0.005-20.0% Sb and Sb-XRF15c for 0.01-80.0% Sb).

 

RUA GOLD Contact

 

New Zealand

Simon Delander

VP Risk Stakeholder Regulatory Affairs

Email: sdelander@RUAGOLD.com

Website: www.RUAGOLD.com

 

Canada

Robert Eckford

Chief Executive Officer

Email: reckford@RUAGOLD.com

 

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this new release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur and specifically include statements regarding: the Company’s strategies, expectations, planned operations or future actions, including but not limited to drill program at the Auld Creek target and the timing and results thereof, the timing or results of PFS, the timing or result of an application for a mine permit, and the expected contributions of Mr. Prins. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements.

 

Investors are cautioned that any such forward-looking statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. A variety of inherent risks, uncertainties and factors, many of which are beyond the Company’s control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include: general business, economic, competitive, political and social uncertainties; risks related to the effects of the Russia-Ukraine war; risks related to climate change; operational risks in exploration, delays or changes in plans with respect to exploration projects or capital expenditures; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; changes in labour costs and other costs and expenses or equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, including but not limited to environmental hazards, flooding or unfavorable operating conditions and losses, insurrection or war, delays in obtaining governmental approvals or financing, and commodity prices. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and reference should also be made to the Company's short form base shelf prospectus dated July 11, 2024, and the documents incorporated by reference therein, filed under its SEDAR+ profile at www.sedarplus.ca for a description of additional risk factors.

 

Forward-looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

 

Table 2: Location of Auld Creek reported drill holes from RUA program

 

Hole ID

Easting

Northing

rL

Total Depth

Site _ID

Dip

Azimuth (true)

Year

ACDDH084

1507192

5333296

514.43

230.5

Pad 04

-59.5

35

2026

ACDDH120

1507183

5333519

452.6

202.5

Pad 05

-46.6

127.2

2026

ACDDH121

1507082

5333094

583.28

397

Pad 08

-68.9

115.7

2026

ACDDH122

1506958

5332959

611.61

457.1

Pad 13

-56.7

92.3

2026

ACDDH123

1507290

5333151

537.69

255.1

Pad 24

-70.6

277.1

2026

ACDDH124

1507072

5332958

605.53

226

Pad 18

-46.7

112.5

2026

ACDDH125

1507183

5333521

452.46

187.5

Pad 05

-51.9

97.5

2026

ACDDH126

1507291

5333149

538.25

244.5

Pad 24

-70.7

260.4

2026

ACDDH127

1507082

5333094

583.17

378.1

Pad 08

-62

66.6

2026

ACDDH128

1507184

5333520

452.6

187.5

Pad 05

-51.9

110.9

2026

ACDDH130

1507290

5333152

537.45

247.5

Pad 24

-69.3

300.5

2026

 

Table 3: Significant drilling intercepts at Auld Creek, full mineralized zone composites

 

Hole_ID

From

To

Interval

Au (g/t)

Sb (%)

ACDDH121

356

356.5

0.5

1.26

0.02

ACDDH121

356.5

357

0.5

3.36

0.01

ACDDH121

357

357.45

0.4

4.28

0.03

ACDDH121

357.45

358

0.6

2.69

0.01

ACDDH121

365.5

366

0.5

0.36

1.60

ACDDH121

366

366.5

0.5

5.18

2.74

ACDDH121

366.5

367

0.5

4.35

1.77

ACDDH121

367

367.5

0.5

2.43

0.83

ACDDH121

367.5

368

0.5

1.42

0.03

ACDDH121

368

368.5

0.5

6.93

0.09

ACDDH121

368.5

368.9

0.4

2.02

0.31

ACDDH121

368.9

369.5

0.6

2.57

0.03

ACDDH121

369.5

370

0.5

0.06

0.01

ACDDH121

370

370.3

0.3

0.2

0.01

ACDDH121

370.3

370.7

0.4

1.36

0.03

ACDDH121

370.7

371.05

0.35

0.19

0.01

ACDDH121

371.05

371.5

0.45

1.64

0.02

ACDDH121

371.5

372

0.5

7.83

0.02

ACDDH121

372

372.5

0.5

3.03

0.01

ACDDH121

372.5

373

0.5

1.02

0.04

ACDDH121

373

373.5

0.5

2.51

0.03

ACDDH121

373.5

374

0.5

7.25

1.85

ACDDH121

374

374.45

0.45

4.56

0.26

ACDDH121

374.45

375

0.55

11.65

0.44

ACDDH121

375

375.5

0.5

11.4

0.02

ACDDH121

375.5

376

0.5

8.25

0.01

ACDDH121

376

376.5

0.5

7.21

0.07

ACDDH121

376.5

377.15

0.65

1.45

0.02

ACDDH123

228

228.95

0.95

0.55

0.49

ACDDH123

228.95

229.25

0.3

14.05

29.20

ACDDH123

229.25

229.9

0.65

17.7

2.09

ACDDH123

229.9

230.2

0.3

22.1

47.30

ACDDH123

236

236.5

0.5

1.59

0.11

ACDDH123

236.5

237

0.5

2.45

0.04

ACDDH123

237

237.7

0.7

3.25

0.02

ACDDH123

237.7

238.3

0.6

9.76

8.03

ACDDH123

238.3

239

0.7

12.1

0.53

ACDDH123

239

239.5

0.5

6.03

1.40

ACDDH123

239.5

240

0.5

0.67

0.02

ACDDH123

240

240.5

0.5

2.93

0.05

ACDDH123

240.5

241

0.5

1.32

-0.01

ACDDH125

168

168.8

0.8

0.25

0.01

ACDDH125

168.8

169.2

0.4

0.76

-0.01

ACDDH125

169.2

169.5

0.3

0.85

0.06

ACDDH125

169.5

170

0.5

0.84

0.02

ACDDH125

170

170.5

0.5

1

0.07

ACDDH125

170.5

171

0.5

0.31

0.01

ACDDH125

171

171.5

0.5

1.34

0.22

ACDDH125

171.5

172

0.5

0.71

0.07

ACDDH125

172

172.5

0.5

2.62

0.76

ACDDH126

228

228.4

0.4

6.22

0.95

ACDDH126

228.4

229

0.6

0.86

0.02

ACDDH126

229

229.5

0.5

5.23

0.04

ACDDH126

229.5

230

0.5

5.61

0.01

ACDDH126

230

231

1

2.38

0.02

ACDDH126

231

232

1

0.73

0.01

ACDDH126

232

232.5

0.5

0.34

0.03

ACDDH126

232.5

233

0.5

1.59

0.14

ACDDH126

233

233.5

0.5

1.07

0.06

ACDDH126

233.5

234

0.5

0.92

0.01

ACDDH126

234

234.5

0.5

0.56

0.03

ACDDH126

234.5

235

0.5

2.28

0.21

ACDDH127

358.95

359.35

0.4

9.6

41.50

ACDDH127

359.35

359.65

0.3

43.6

33.30

ACDDH127

359.65

360

0.35

17.85

17.45

ACDDH127

360

360.5

0.5

16.45

6.51

ACDDH127

360.5

361

0.5

3.19

3.29

ACDDH127

361

361.5

0.5

9.46

3.63

ACDDH127

361.5

362

0.5

5.6

1.16

ACDDH127

362

362.5

0.5

17.75

2.53

ACDDH127

362.5

363

0.5

2.06

0.21

ACDDH127

363

363.45

0.45

4.71

0.14

ACDDH127

363.45

364.1

0.65

16.7

1.98

ACDDH127

364.1

364.5

0.4

1.99

0.13

ACDDH127

364.5

365

0.5

6.56

2.20

 

 

 

 

 

 

ACDDH127

365

365.5

0.5

2.36

0.14

ACDDH127

368

368.65

0.65

1.77

0.39

ACDDH127

368.65

369.15

0.5

0.76

3.34

ACDDH127

369.15

370

0.85

0.68

0.81

ACDDH127

370

370.5

0.5

1.18

0.23

ACDDH127

370.5

371

0.5

1.09

0.43

ACDDH128

170.5

171

0.5

2.34

5.19

ACDDH128

171

172

1

0.3

0.16

ACDDH128

172

173

1

0.5

1.07

ACDDH130

207.6

208.3

0.7

1.74

0.01

ACDDH130

208.3

208.8

0.5

4.07

0.01

ACDDH130

208.8

209.4

0.6

13.05

0.01

ACDDH130

209.4

209.8

0.4

22.6

0.01

ACDDH130

209.8

210.2

0.4

25

0.05

ACDDH130

210.2

210.5

0.3

33

6.75

ACDDH130

210.5

210.8

0.3

69.2

0.07

ACDDH130

210.8

211.7

0.9

12.5

0.04

ACDDH130

211.7

212.5

0.8

6.57

0.01

ACDDH130

212.5

213

0.5

3.7

-0.01

ACDDH130

213

213.7

0.7

9.18

0.01

ACDDH130

213.7

214.6

0.9

2.01

-0.01

ACDDH124

209.1

209.5

0.4

1.03

0.03

ACDDH124

209.5

210.05

0.55

2.15

0.03

ACDDH124

210.05

210.5

0.45

0.12

-0.01

ACDDH124

210.5

211

0.5

0.61

0.03

ACDDH124

211

211.35

0.35

5.2

3.39

ACDDH124

211.35

212

0.65

0.99

0.04

ACDDH124

212

212.6

0.6

0.46

0.01

ACDDH124

212.6

213.25

0.65

1.14

0.01

ACDDH124

213.25

214

0.75

0.01

0.01

ACDDH124

214

214.5

0.5

0.01

0.01

ACDDH124

214.5

215

0.5

0.01

0.01

ACDDH124

215

215.5

0.5

2.5

4.76

ACDDH124

215.5

216

0.5

3.03

0.19

ACDDH124

216

216.5

0.5

0.38

0.01

ACDDH124

216.5

217

0.5

1.69

0.02

ACDDH124

217

217.5

0.5

1.97

0.02

ACDDH124

217.5

218

0.5

0.88

0.01

ACDDH124

218

218.5

0.5

1.09

0.01

ACDDH124

218.5

219

0.5

2.71

0.01

ACDDH124

219

219.5

0.5

1.38

0.01

 


[i] See Rua Gold news release “RUA GOLD’s Auld Creek Project Qualifies for New Zealand’s 6-Month Fast-Track Approvals Process” dated July 30, 2026, available on the Company’s website at www.ruagold.com and on SEDAR+ at www.sedarplus.ca  

[ii]Based on the recent Reefton Technical Report, the gold equivalent formula is based on AuEq = Au g/t + 2.15 x Sb% using a Au price of US$3,000/oz, Sb price of US$25,000 per tonne and 85% recovery.

[iii] Technical Report on the Reefton Project, New Zealand, with an effective date of February 27, 2026 available under the Company's SEDAR+ profile at www.sedarplus.ca.

[iv] Christie, A., Simpson, M., Barker, R., and Braithwaite, R. 2019. Exploration for epithermal Au-Ag deposits in New Zealand: history and strategy. New Zealand Journal of Geology and Geophysics, 62:1, 414-441. NI 43-101 Technical Report, Waihi District Pre-feasibility Study, New Zealand. OceanaGold Corporation, Report Date: December 11, 2024.