October 7, 2026

Tiger Gold Corp.
Tiger Gold Completes Infill and Extension Drill Program at Tesorito and Accelerates Drilling at Ceibal with Three Rigs

Tiger Gold Drills 165.7 m @ 0.9 g/t Au at Depth, Including 36 m @ 2.9 g/t Au, at Ceibal

Tiger Gold Drills 685 m @ 0.6 g/t Au from Surface and 568 m @ 0.6 g/t Au at Ceibal

Tiger Gold Closes Acquisition and Accelerates Drilling at Quinchia

Tiger Gold Intersects 234.5 m @ 1.2 g/t Au and 180.3 m @ 1.0 g/t Au at Tesorito

Tiger Gold Intersects 98 m @ 0.9 g/t Au including 26.7 m @ 1.6 g/t Au at Tesorito

Tiger Gold Drills 214m @ 0.7 g/t Au including 23m of 1.1g/t Au and 9m of 2.2g/t in 80-Metre Step-out Hole at Ceibal

Tiger Gold Drills 120 m Step-out at Ceibal and Intersects 226 m @ 0.6 g/t Au, Including 10 m @ 3 g/t Au

Tiger Gold Drills 282 m @ 0.6 g/t Au, including 32 m @ 1.3 g/t Au and 21 m @ 1.6 g/t Au, at Dos Quebradas in Initial Drill Program

Tiger Gold Intersects 169.7 m at 0.9 g/t Au of Porphyry-Style Mineralization at Tesorito, Including 25 m at 2.2 g/t Au

Tiger Gold Accelerates Drilling at Ceibal and Increases Initial Drill Program to 5,000 Metres

Tiger Gold Mobilizes for Drilling at Ceibal Target at Quinchía Gold Project
