June 22, 2026

Total Metals Corp.
Total Metals Reports Positive Results at its Electrolode Critical Metals Project – Including High-Grade intercepts up to 38.20% Zinc over 0.42m and 3.59% Copper over 1.91m

Total Metals Completes High-Resolution Airborne Magnetic Survey at its High-Grade High Lake Gold Property, Northwestern Ontario

Total Metals Completes 25 Hole, 8,408 metre Exploration Drilling Program on its Electrolode Critical Minerals Project

Total Metals commences Exploration Drilling on its Critical Minerals Electrolode Project – Red Lake, Ontario
